Analysis on the Influence of Increasing Seismic Fortification Intensity on Seismic Performance of Underground Station
China Earthquake Parameter Zoning (2016) has increased the seismic fortification intensity in Chengdu from VII to VIII. It is necessary to conduct in-depth discussion on the impact of the seismic performance of the built underground station structure. In this paper, a stratum-structure finite elemen...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2021-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/8158607 |