Planning for Maintenance and Repair of Continuous Ship Unloader Using the IRRO Method
The problem faced is damage, especially to the screw conveyor from the Continuous Ship Unloader (CSU) as a dry bulk material transfer equipment (phosphate rock) which is taken from the ship's hold which is flowed by a screw conveyor followed by the belt conveyor to the material warehouse to be...
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | Indonesian |
Published: |
Politeknik Negeri Bali
2021-03-01
|
Series: | Logic |
Subjects: | |
Online Access: | http://ojs.pnb.ac.id/index.php/LOGIC/article/view/2383/1664 |
id |
doaj-7da61f66b6ce4f27890bc2e7a7671f1e |
---|---|
record_format |
Article |
spelling |
doaj-7da61f66b6ce4f27890bc2e7a7671f1e2021-04-08T21:54:56ZindPoliteknik Negeri BaliLogic1412-114X2580-56492021-03-01211526310.31940/logic.v21i1.2383Planning for Maintenance and Repair of Continuous Ship Unloader Using the IRRO MethodSyamsul Hadi0Alfarizi Al Azis1Vinan Viyus2Etik Puspitasari3Ahmad Hanif Firdaus4Andri Setiawan5Politeknik Negeri MalangPoliteknik Negeri MalangPoliteknik Negeri MalangPoliteknik Negeri MalangPoliteknik Negeri MalangPoliteknik Negeri MalangThe problem faced is damage, especially to the screw conveyor from the Continuous Ship Unloader (CSU) as a dry bulk material transfer equipment (phosphate rock) which is taken from the ship's hold which is flowed by a screw conveyor followed by the belt conveyor to the material warehouse to be processed into a type of fertilizer. The purpose of planning is to obtain a schedule and estimated cost of maintenance and repair of CSU for the period 2022 to 2025, and to obtain the ratio of maintenance-repair costs to the profit of the machine. Planning methods uses the IRRO (Inspection, Replace, Repair, and Overhoul) method include data collection of machine maintenance history and component breakdowns, checking CSU specifications, making a list of component life predictions and component prices, predicting costs and duration of component dissasembly, screw conveyor repair, maintenance and repair scheduling, and maintenance and repair cost estimates. The real results of planning in the form of a maintenance and repair schedule for the period of 2022 to 2025; maintenance and repair costs respectively for the years 2022 to 2025 are IDR 136,873,000; IDR 335,986,000; IDR 160,687,000; and IDR 464,733,000; and the ratio between maintenance costs to profit for the years 2022 to 2025 is 0.51, 1.22, 0.57, and 1.63 which means the machine is still fit for use without the need for refurbishment because it is still prospective.http://ojs.pnb.ac.id/index.php/LOGIC/article/view/2383/1664continuous ship unloaderscrew conveyordry bulk materialphosphate rockbelt conveyorirro |
collection |
DOAJ |
language |
Indonesian |
format |
Article |
sources |
DOAJ |
author |
Syamsul Hadi Alfarizi Al Azis Vinan Viyus Etik Puspitasari Ahmad Hanif Firdaus Andri Setiawan |
spellingShingle |
Syamsul Hadi Alfarizi Al Azis Vinan Viyus Etik Puspitasari Ahmad Hanif Firdaus Andri Setiawan Planning for Maintenance and Repair of Continuous Ship Unloader Using the IRRO Method Logic continuous ship unloader screw conveyor dry bulk material phosphate rock belt conveyor irro |
author_facet |
Syamsul Hadi Alfarizi Al Azis Vinan Viyus Etik Puspitasari Ahmad Hanif Firdaus Andri Setiawan |
author_sort |
Syamsul Hadi |
title |
Planning for Maintenance and Repair of Continuous Ship Unloader Using the IRRO Method |
title_short |
Planning for Maintenance and Repair of Continuous Ship Unloader Using the IRRO Method |
title_full |
Planning for Maintenance and Repair of Continuous Ship Unloader Using the IRRO Method |
title_fullStr |
Planning for Maintenance and Repair of Continuous Ship Unloader Using the IRRO Method |
title_full_unstemmed |
Planning for Maintenance and Repair of Continuous Ship Unloader Using the IRRO Method |
title_sort |
planning for maintenance and repair of continuous ship unloader using the irro method |
publisher |
Politeknik Negeri Bali |
series |
Logic |
issn |
1412-114X 2580-5649 |
publishDate |
2021-03-01 |
description |
The problem faced is damage, especially to the screw conveyor from the Continuous Ship Unloader (CSU) as a dry bulk material transfer equipment (phosphate rock) which is taken from the ship's hold which is flowed by a screw conveyor followed by the belt conveyor to the material warehouse to be processed into a type of fertilizer. The purpose of planning is to obtain a schedule and estimated cost of maintenance and repair of CSU for the period 2022 to 2025, and to obtain the ratio of maintenance-repair costs to the profit of the machine. Planning methods uses the IRRO (Inspection, Replace, Repair, and Overhoul) method include data collection of machine maintenance history and component breakdowns, checking CSU specifications, making a list of component life predictions and component prices, predicting costs and duration of component dissasembly, screw conveyor repair, maintenance and repair scheduling, and maintenance and repair cost estimates. The real results of planning in the form of a maintenance and repair schedule for the period of 2022 to 2025; maintenance and repair costs respectively for the years 2022 to 2025 are IDR 136,873,000; IDR 335,986,000; IDR 160,687,000; and IDR 464,733,000; and the ratio between maintenance costs to profit for the years 2022 to 2025 is 0.51, 1.22, 0.57, and 1.63 which means the machine is still fit for use without the need for refurbishment because it is still prospective. |
topic |
continuous ship unloader screw conveyor dry bulk material phosphate rock belt conveyor irro |
url |
http://ojs.pnb.ac.id/index.php/LOGIC/article/view/2383/1664 |
work_keys_str_mv |
AT syamsulhadi planningformaintenanceandrepairofcontinuousshipunloaderusingtheirromethod AT alfarizialazis planningformaintenanceandrepairofcontinuousshipunloaderusingtheirromethod AT vinanviyus planningformaintenanceandrepairofcontinuousshipunloaderusingtheirromethod AT etikpuspitasari planningformaintenanceandrepairofcontinuousshipunloaderusingtheirromethod AT ahmadhaniffirdaus planningformaintenanceandrepairofcontinuousshipunloaderusingtheirromethod AT andrisetiawan planningformaintenanceandrepairofcontinuousshipunloaderusingtheirromethod |
_version_ |
1721533708098338816 |