Pengurangan Pemborosan Waktu Produksi Pada Proses Pembuatan Rumah Boneka Menggunakan Pendekatan Lean
CV. Puppet house is a small and medium-sized industrial enterprise and manufactures in producing doll house with wood base material. The purpose of this study is to know the kind of wasted production time on each production process at CV. Puppet house and give repair suggestions so as to increase th...
Main Author: | tiara tiara |
---|---|
Format: | Article |
Language: | Indonesian |
Published: |
Lembaga Penelitian Universitas Indraprasta PGRI
2018-10-01
|
Series: | Faktor Exacta |
Online Access: | http://journal.lppmunindra.ac.id/index.php/Faktor_Exacta/article/view/2685 |
Similar Items
-
PENGURANGAN WASTE MENGGUNAKAN PENDEKATAN LEAN MANUFACTURING
by: Akhmad Jakfar, et al.
Published: (2014-06-01) -
PENGURANGAN WASTE MENGGUNAKAN PENDEKATAN LEAN MANUFACTURING
by: Akhmad Jakfar, et al.
Published: (2014-06-01) -
IMPLEMENTASI KONSEP LEAN MANUFACTURING GUNA MENGURANGI PEMBOROSAN DI LANTAI PRODUKSI
by: Almer Panji Pradana, et al.
Published: (2018-06-01) -
Penentuan Waktu Proses Pembuatan Kain dengan Pendekatan Cross-Case pada Industri Tekstil
by: Evan Nugraha, et al.
Published: (2018-06-01) -
REDUKSI PEMBOROSAN UNTUK PERBAIKAN VALUE STREAM PRODUKSI “MI LETHEK” MENGGUNAKAN PENDEKATAN LEAN MANUFACTURING (Waste Reduction to Improve Value Stream of “Mi Lethek” Production Using Lean Manufacturing Approach)
by: Aditya Nugroho, et al.
Published: (2015-09-01)