The Practice of Forward Prospecting of Adverse Geology Applied to Hard Rock TBM Tunnel Construction: The Case of the Songhua River Water Conveyance Project in the Middle of Jilin Province
An increasing number of tunnels are being constructed with tunnel-boring machines (TBMs) due to the increased efficiency and shorter completion time resulting from their use. However, when a TBM encounters adverse geological conditions in the course of tunnel construction (e.g., karst caves, faults,...
Main Authors: | Shucai Li, Lichao Nie, Bin Liu |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2018-02-01
|
Series: | Engineering |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2095809917308147 |
Similar Items
-
Anti Abrasive Additives for Hard Rock TBM Tunnelling
by: Valestrand, Anders J, et al.
Published: (2013) -
TBM-Mounted Seismic Ahead-Prospecting for Fast Detecting Anomalous Geology Ahead of Tunnel Face
by: Lichao Nie, et al.
Published: (2021-01-01) -
Prediction of the geological indicators in TBM tunnel based on optimized proportion of surrounding rock grades
by: Guo, W., et al.
Published: (2023) -
Numerical analysis of hard rock tunnel excavated by double shield TBM based on CWFS model
by: Diyuan Li, et al.
Published: (2019-06-01) -
Analysis of effects of geological structures in rock driving by TBM
by: Ľudmila Tréfová
Published: (2006-12-01)