Optimization Method of Locomotive Working Diagram Layout

Rational scheduling of locomotive paths (the locus of the locomotive point in the train working diagram) is an important step in drawing a locomotive working diagram by a computer. But there are some problems in this process, such as the computer usually drawing a locomotive path that overlaps with...

Full description

Bibliographic Details
Main Authors: Yajing Zheng, Wenzhou Jin
Format: Article
Language:English
Published: Hindawi-Wiley 2019-01-01
Series:Journal of Advanced Transportation
Online Access:http://dx.doi.org/10.1155/2019/1315638
id doaj-7b64427f6b7e436ea6010f01a0732f4b
record_format Article
spelling doaj-7b64427f6b7e436ea6010f01a0732f4b2020-11-25T00:40:29ZengHindawi-WileyJournal of Advanced Transportation0197-67292042-31952019-01-01201910.1155/2019/13156381315638Optimization Method of Locomotive Working Diagram LayoutYajing Zheng0Wenzhou Jin1School of Civil Engineering and Transportation, South China University of Technology, Guangzhou 510641, ChinaSchool of Civil Engineering and Transportation, South China University of Technology, Guangzhou 510641, ChinaRational scheduling of locomotive paths (the locus of the locomotive point in the train working diagram) is an important step in drawing a locomotive working diagram by a computer. But there are some problems in this process, such as the computer usually drawing a locomotive path that overlaps with another locomotive path (in the circumstances, the actual users of the locomotive working diagrams often misread the locomotive planning). At present, there are many studies about assigning sets of locomotives to each train in a preplanned train schedule; in contrast, the studies of visualizing the locomotive planning are relatively rare. Through investigating the locomotive working diagram users, this paper points out that the layout of locomotive paths should put the distance between lines being as large as possible and should put the number of the intersection between lines being as few as possible as the optimization aim which is based to solve the problem of the lines overlap or the problem of the lines beyond the margins for drawing the locomotive paths. This paper also builds the optimization model of locomotive working diagram layout. Based on determining the position of locomotive paths which can be delineated, a genetic algorithm is used to solve the optimizing model of locomotive working diagram layout in this paper. An example of a train working diagram with 36 trains is given at the end of the paper, which indicates that the optimization model of locomotive working diagram layout can better solve the problem of locomotive planning visualization.http://dx.doi.org/10.1155/2019/1315638
collection DOAJ
language English
format Article
sources DOAJ
author Yajing Zheng
Wenzhou Jin
spellingShingle Yajing Zheng
Wenzhou Jin
Optimization Method of Locomotive Working Diagram Layout
Journal of Advanced Transportation
author_facet Yajing Zheng
Wenzhou Jin
author_sort Yajing Zheng
title Optimization Method of Locomotive Working Diagram Layout
title_short Optimization Method of Locomotive Working Diagram Layout
title_full Optimization Method of Locomotive Working Diagram Layout
title_fullStr Optimization Method of Locomotive Working Diagram Layout
title_full_unstemmed Optimization Method of Locomotive Working Diagram Layout
title_sort optimization method of locomotive working diagram layout
publisher Hindawi-Wiley
series Journal of Advanced Transportation
issn 0197-6729
2042-3195
publishDate 2019-01-01
description Rational scheduling of locomotive paths (the locus of the locomotive point in the train working diagram) is an important step in drawing a locomotive working diagram by a computer. But there are some problems in this process, such as the computer usually drawing a locomotive path that overlaps with another locomotive path (in the circumstances, the actual users of the locomotive working diagrams often misread the locomotive planning). At present, there are many studies about assigning sets of locomotives to each train in a preplanned train schedule; in contrast, the studies of visualizing the locomotive planning are relatively rare. Through investigating the locomotive working diagram users, this paper points out that the layout of locomotive paths should put the distance between lines being as large as possible and should put the number of the intersection between lines being as few as possible as the optimization aim which is based to solve the problem of the lines overlap or the problem of the lines beyond the margins for drawing the locomotive paths. This paper also builds the optimization model of locomotive working diagram layout. Based on determining the position of locomotive paths which can be delineated, a genetic algorithm is used to solve the optimizing model of locomotive working diagram layout in this paper. An example of a train working diagram with 36 trains is given at the end of the paper, which indicates that the optimization model of locomotive working diagram layout can better solve the problem of locomotive planning visualization.
url http://dx.doi.org/10.1155/2019/1315638
work_keys_str_mv AT yajingzheng optimizationmethodoflocomotiveworkingdiagramlayout
AT wenzhoujin optimizationmethodoflocomotiveworkingdiagramlayout
_version_ 1725289831417774080