Providing rationale for the possibility of decommissioning Bilibino nuclear cogeneration plant based on the onsite disposal option
The problem of the NPP decommissioning after the end of the specified or extended life has reached the practical solution stage for countries possessing a nuclear power industry. The major decommissioning options, both in Russia and abroad, include immediate dismantling and deferred...
Main Authors: | Igor A. Engovatov, Rinat Kh. Adiyatullin |
---|---|
Format: | Article |
Language: | English |
Published: |
National Research Nuclear University (MEPhI)
2020-11-01
|
Series: | Nuclear Energy and Technology |
Online Access: | https://nucet.pensoft.net/article/58969/download/pdf/ |
Similar Items
-
Comprehensive engineering and radiation surveys in decommissioning of nuclear power plants КОМПЛЕКСНОЕ ИНЖЕНЕРНОЕ И РАДИАЦИОННОЕ ОБСЛЕДОВАНИЕ В ПРОБЛЕМЕ ВЫВОДА ИЗ ЭКСПЛУАТАЦИИ ЭНЕРГОБЛОКОВ АЭС
by: Engovatov Igor’ Anatol’evich
Published: (2013-01-01) -
On the necessity and the role of descriptors of neutron activated structural and shielding materials of nuclear installations for future decommissioning
by: Boris K. Bylkin, et al.
Published: (2018-12-01) -
Denitrification in low pressure distribution onsite wastewater disposal systems
by: Degen, Marcia J.
Published: (2014) -
Ice pigging in the nuclear decommissioning industry
by: McBryde, Daniel John
Published: (2015) -
Good practices in decommissioning planning and pre-decommissioning activities for the Magurele VVR-S nuclear research reactor
by: Dragusin Mitica, et al.
Published: (2011-01-01)