Cost prediction model based on system dynamics in water resource project

Project’s cost is one of important components in project achievement. Because of the uniqueness of construction projects, cost estimation always differs from project to project. The rate of cost components always change over time make difficult to forecast the cost for the upcoming project. The cost...

Full description

Bibliographic Details
Main Authors: Hirijanto, Mundra I Wayan, Utomo Addy
Format: Article
Language:English
Published: EDP Sciences 2019-01-01
Series:MATEC Web of Conferences
Subjects:
Online Access:https://doi.org/10.1051/matecconf/201925802027
id doaj-7718d3de90614eb193c5565d50950865
record_format Article
spelling doaj-7718d3de90614eb193c5565d509508652021-03-02T07:36:19ZengEDP SciencesMATEC Web of Conferences2261-236X2019-01-012580202710.1051/matecconf/201925802027matecconf_scescm2019_02027Cost prediction model based on system dynamics in water resource projectHirijanto0Mundra I Wayan1Utomo Addy2Department of Civil Engineering, National Institute of TechnologyDepartment of Civil Engineering, National Institute of TechnologyDepartment of Civil Engineering, National Institute of TechnologyProject’s cost is one of important components in project achievement. Because of the uniqueness of construction projects, cost estimation always differs from project to project. The rate of cost components always change over time make difficult to forecast the cost for the upcoming project. The cost component consists of many influencing variables where there is interrelationship each other affecting to the total project cost. This paper objective is to develop a cost prediction model to assist the project planners in cost estimation for future projects. System dynamic is one of the appropriate methods to analyse system behaviour with interrelationship referring to the historic data, so it is able to predict the future project. Developing the model, primary and secondary data are collected from previous studies, interview with the government planner and survey in Malang Regency. The model simulation is Brick work unit with its components. Data from last thirteen years are used to verify and validate the developed model by causal loop diagram as a basic method in system dynamic. The finding showed that the model is closed to real condition through the validation mechanism. The developed system is useful in decision making of budget planning based on work quantity.https://doi.org/10.1051/matecconf/201925802027Prediction modelProject costSystem dynamics
collection DOAJ
language English
format Article
sources DOAJ
author Hirijanto
Mundra I Wayan
Utomo Addy
spellingShingle Hirijanto
Mundra I Wayan
Utomo Addy
Cost prediction model based on system dynamics in water resource project
MATEC Web of Conferences
Prediction model
Project cost
System dynamics
author_facet Hirijanto
Mundra I Wayan
Utomo Addy
author_sort Hirijanto
title Cost prediction model based on system dynamics in water resource project
title_short Cost prediction model based on system dynamics in water resource project
title_full Cost prediction model based on system dynamics in water resource project
title_fullStr Cost prediction model based on system dynamics in water resource project
title_full_unstemmed Cost prediction model based on system dynamics in water resource project
title_sort cost prediction model based on system dynamics in water resource project
publisher EDP Sciences
series MATEC Web of Conferences
issn 2261-236X
publishDate 2019-01-01
description Project’s cost is one of important components in project achievement. Because of the uniqueness of construction projects, cost estimation always differs from project to project. The rate of cost components always change over time make difficult to forecast the cost for the upcoming project. The cost component consists of many influencing variables where there is interrelationship each other affecting to the total project cost. This paper objective is to develop a cost prediction model to assist the project planners in cost estimation for future projects. System dynamic is one of the appropriate methods to analyse system behaviour with interrelationship referring to the historic data, so it is able to predict the future project. Developing the model, primary and secondary data are collected from previous studies, interview with the government planner and survey in Malang Regency. The model simulation is Brick work unit with its components. Data from last thirteen years are used to verify and validate the developed model by causal loop diagram as a basic method in system dynamic. The finding showed that the model is closed to real condition through the validation mechanism. The developed system is useful in decision making of budget planning based on work quantity.
topic Prediction model
Project cost
System dynamics
url https://doi.org/10.1051/matecconf/201925802027
work_keys_str_mv AT hirijanto costpredictionmodelbasedonsystemdynamicsinwaterresourceproject
AT mundraiwayan costpredictionmodelbasedonsystemdynamicsinwaterresourceproject
AT utomoaddy costpredictionmodelbasedonsystemdynamicsinwaterresourceproject
_version_ 1724241196048449536