Cost prediction model based on system dynamics in water resource project
Project’s cost is one of important components in project achievement. Because of the uniqueness of construction projects, cost estimation always differs from project to project. The rate of cost components always change over time make difficult to forecast the cost for the upcoming project. The cost...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2019-01-01
|
Series: | MATEC Web of Conferences |
Subjects: | |
Online Access: | https://doi.org/10.1051/matecconf/201925802027 |
id |
doaj-7718d3de90614eb193c5565d50950865 |
---|---|
record_format |
Article |
spelling |
doaj-7718d3de90614eb193c5565d509508652021-03-02T07:36:19ZengEDP SciencesMATEC Web of Conferences2261-236X2019-01-012580202710.1051/matecconf/201925802027matecconf_scescm2019_02027Cost prediction model based on system dynamics in water resource projectHirijanto0Mundra I Wayan1Utomo Addy2Department of Civil Engineering, National Institute of TechnologyDepartment of Civil Engineering, National Institute of TechnologyDepartment of Civil Engineering, National Institute of TechnologyProject’s cost is one of important components in project achievement. Because of the uniqueness of construction projects, cost estimation always differs from project to project. The rate of cost components always change over time make difficult to forecast the cost for the upcoming project. The cost component consists of many influencing variables where there is interrelationship each other affecting to the total project cost. This paper objective is to develop a cost prediction model to assist the project planners in cost estimation for future projects. System dynamic is one of the appropriate methods to analyse system behaviour with interrelationship referring to the historic data, so it is able to predict the future project. Developing the model, primary and secondary data are collected from previous studies, interview with the government planner and survey in Malang Regency. The model simulation is Brick work unit with its components. Data from last thirteen years are used to verify and validate the developed model by causal loop diagram as a basic method in system dynamic. The finding showed that the model is closed to real condition through the validation mechanism. The developed system is useful in decision making of budget planning based on work quantity.https://doi.org/10.1051/matecconf/201925802027Prediction modelProject costSystem dynamics |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Hirijanto Mundra I Wayan Utomo Addy |
spellingShingle |
Hirijanto Mundra I Wayan Utomo Addy Cost prediction model based on system dynamics in water resource project MATEC Web of Conferences Prediction model Project cost System dynamics |
author_facet |
Hirijanto Mundra I Wayan Utomo Addy |
author_sort |
Hirijanto |
title |
Cost prediction model based on system dynamics in water resource project |
title_short |
Cost prediction model based on system dynamics in water resource project |
title_full |
Cost prediction model based on system dynamics in water resource project |
title_fullStr |
Cost prediction model based on system dynamics in water resource project |
title_full_unstemmed |
Cost prediction model based on system dynamics in water resource project |
title_sort |
cost prediction model based on system dynamics in water resource project |
publisher |
EDP Sciences |
series |
MATEC Web of Conferences |
issn |
2261-236X |
publishDate |
2019-01-01 |
description |
Project’s cost is one of important components in project achievement. Because of the uniqueness of construction projects, cost estimation always differs from project to project. The rate of cost components always change over time make difficult to forecast the cost for the upcoming project. The cost component consists of many influencing variables where there is interrelationship each other affecting to the total project cost. This paper objective is to develop a cost prediction model to assist the project planners in cost estimation for future projects. System dynamic is one of the appropriate methods to analyse system behaviour with interrelationship referring to the historic data, so it is able to predict the future project. Developing the model, primary and secondary data are collected from previous studies, interview with the government planner and survey in Malang Regency. The model simulation is Brick work unit with its components. Data from last thirteen years are used to verify and validate the developed model by causal loop diagram as a basic method in system dynamic. The finding showed that the model is closed to real condition through the validation mechanism. The developed system is useful in decision making of budget planning based on work quantity. |
topic |
Prediction model Project cost System dynamics |
url |
https://doi.org/10.1051/matecconf/201925802027 |
work_keys_str_mv |
AT hirijanto costpredictionmodelbasedonsystemdynamicsinwaterresourceproject AT mundraiwayan costpredictionmodelbasedonsystemdynamicsinwaterresourceproject AT utomoaddy costpredictionmodelbasedonsystemdynamicsinwaterresourceproject |
_version_ |
1724241196048449536 |