Using the Analytic Hierarchy Process to Prioritize and Select Phase Change Materials for Comfort Application in Buildings
Phase change materials (PCMs) selection and prioritization for comfort application in buildings have a significant contribution to the improvement of latent heat storage systems. PCMs have a relatively large thermal energy storage capacity in a temperature range close to their switch point. PCMs abs...
Main Authors: | Socaciu Lavinia Gabriela, Unguresan Paula Veronica |
---|---|
Format: | Article |
Language: | English |
Published: |
Sciendo
2014-03-01
|
Series: | Mathematical Modelling in Civil Engineering |
Subjects: | |
Online Access: | http://www.degruyter.com/view/j/mmce.2014.10.issue-1/mmce-2014-0003/mmce-2014-0003.xml?format=INT |
Similar Items
-
The comparison between Analytical Hierarchy Process (AHP) and Data Envelopment Analysis (DEA) in prioritizing of key decision making indicators for buying and selling
by: Saleh Mansouri, et al.
Published: (2007-04-01) -
Prioritizing highway maintenance functions using the analytical hierarchy process
by: Gonzalez, Epigmenio
Published: (2012) -
Development of a managerial tool for prioritization and selection of portfolio projects using the Analytic Hierarchy Process methodology in software companies
by: Roberto Kaiser, et al. -
Prioritizing methods of control and reduce noise pollution in Larestan cement Factory using analytical hierarchy process (AHP)
by: E Sekhavati, et al.
Published: (2014-07-01) -
SUPPLIER PLANNING WITH ANALYTICAL HIERARCHY PROCESS
by: Gabriela Ižaríková
Published: (2019-12-01)