Analisis Prioritas Rehabilitasi Bendung:Studi Kasus Bendung Cokrobedog, Gamping, Pendowo dan Pijenan di Kali Bedog
The government provided Special Allocation Budget via APBD for rehabilitation activities in order to increase the function and physical condition of the weirs. The rehabilitation performances must be run stage by stage due to the limitation of allocation budget, however, it would be continual. Hence...
Main Author: | Nanda Melyadi Putri |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Muhammadiyah Yogyakarta
2018-05-01
|
Series: | Semesta Teknika |
Subjects: | |
Online Access: | https://journal.umy.ac.id/index.php/st/article/view/3664 |
Similar Items
-
Analisis Prioritas Rehabilitasi Bendung (Studi Kasus Bendung Cokrobedog, Gamping, Pendowo, dan Pijenan di Kali Bedog)
by: Nanda Melyadi Putri
Published: (2018-09-01) -
STUDI MUATAN SUSPENDED LOAD DAN BED LOAD PADA UPSTREAM BENDUNG DI HULU SUNGAI-SUNGAI BESAR KABUPATEN BANYUWANGI
by: Feny Yuliana Wardani, et al.
Published: (2018-03-01) -
Study And Design Of Two-Thirds Power Weir
by: Reddy, K Ranga
Published: (2006) -
Dimensional analysis and stage-discharge relationship for weirs: a review
by: Mohammad Bijankhan, et al.
Published: (2017-02-01) -
Optimization And Design Of Proportional Weirs
by: Rangaraj, C
Published: (2012)