A Cost Optimization Model for Multiresource Leveling Problem without Project Duration Constraint

The study of traditional resource leveling problem aims at minimizing the resource usage fluctuations and obtaining sustainable resource supplement, which is accomplished by adjusting noncritical activities within their start and finish time. However, there exist limitations in terms of the traditio...

Full description

Bibliographic Details
Main Authors: Qingyou Yan, Qian Zhang, Xin Zou
Format: Article
Language:English
Published: Hindawi Limited 2016-01-01
Series:Discrete Dynamics in Nature and Society
Online Access:http://dx.doi.org/10.1155/2016/1514959