Integrated Production and Distribution Scheduling Problems Related to Fixed Delivery Departure Dates and Weights of Late Orders
We consider an integrated production and distribution scheduling problem faced by a typical make-to-order manufacturer which relies on a third-party logistics (3PL) provider for finished product delivery to customers. In the beginning of a planning horizon, the manufacturer has received a set of ord...
Main Authors: | Shanlin Li, Maoqin Li |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2015-01-01
|
Series: | The Scientific World Journal |
Online Access: | http://dx.doi.org/10.1155/2015/804968 |
Similar Items
-
Scheduling with fixed delivery dates
by: Lesaoana, 'Maseka A.
Published: (1991) -
Supply Chain Batching Problem with Identical Orders and Lifespan
by: Shanlin Li, et al.
Published: (2015-01-01) -
Integrated Scheduling of Production and Distribution with Release Dates and Capacitated Deliveries
by: Xueling Zhong, et al.
Published: (2016-01-01) -
A Note on Multimachine Scheduling with Weighted Early/Late Work Criteria and Common Due Date
by: Kerang Cao, et al.
Published: (2021-01-01) -
Integrated Production and Distribution Problem of Perishable Products with a Minimum Total Order Weighted Delivery Time
by: Ling Liu, et al.
Published: (2020-01-01)