Optimisation of make-to-order production for multiple-line production
This work tries to consider the make-to-order production of multiple-line production with the considerations of production rate, production time interval, production yield, holding cost, manufacturing cost, setup cost, the penalty cost of shortage and constrained delivery deadline. Based on the rese...
Main Author: | Chien-Chung Lee |
---|---|
Format: | Article |
Language: | English |
Published: |
Stellenbosch University
2013-11-01
|
Series: | South African Journal of Industrial Engineering |
Subjects: | |
Online Access: | http://sajie.journals.ac.za/pub/article/view/639 |
Similar Items
-
Feature Selection Optimization in Software Product Lines
by: Uzma Afzal, et al.
Published: (2020-01-01) -
A New Hybrid Method for Redundancy Allocation in Production Systems using Modified NSGA-II and MOPSO Algorithm
by: Ali Mohtashami
Published: (2015-01-01) -
Particle Swarm Optimization to Solve Competitive Production Routing Problem
by: Farzaneh Adabi, et al.
Published: (2018-07-01) -
Multi-Site Aggregate Production Planning Using Particle Swarm Optimization
by: Aji Prasetya Wibawa, et al.
Published: (2022-01-01) -
Derivative load voltage and particle swarm optimization to determine optimum sizing and placement of shunt capacitor in improving line losses
by: Mohamed Milad Baiek, et al.
Published: (2016-12-01)