Productivity Evaluation for Long Horizontal Well Test in Deep-Water Faulted Sandstone Reservoir
For deep-water faulted sandstone reservoirs, the general practice is to design long horizontal wells improving well productivity. During the project implementation stage, well tests are performed on all drilled wells to evaluate well productivity accurately. Furthermore, multisize chokes are often u...
Main Authors: | Zhiwang Yuan, Li Yang, Yingchun Zhang, Rui Duan, Xu Zhang, Yihua Gao, Baoquan Yang |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi-Wiley
2020-01-01
|
Series: | Geofluids |
Online Access: | http://dx.doi.org/10.1155/2020/8845270 |
Similar Items
-
Field test of volume fracturing for horizontal wells in Sulige tight sandstone gas reservoirs, NW China
by: Xu MA, et al.
Published: (2014-12-01) -
Production performance analysis for horizontal wells in composite coal bed methane reservoir
by: Zhang Wei, et al.
Published: (2017-03-01) -
Quantification of flow impairment in faulted sandstone reservoirs
by: Manzocchi, Thomas H. P.
Published: (1997) -
Drilling fluid technology for horizontal wells to protect the formations in unconsolidated sandstone heavy oil reservoirs
by: Yue Qiansheng, et al.
Published: (2010-04-01) -
Water-out performance and pattern of horizontal wells for marine sandstone reservoirs in Tarim Basin, NW China
by: Guangwei LIU, et al.
Published: (2018-02-01)