Analysis of the acceleration of the time on the project showroom Nissan, office and workshop in Pekanbaru city

Completion time determination in project management is among the first and the most important in the process of planning because it can be the basis for the whole planning. Project completion delay result in the elongation of construction time thus it can inflict a costly penalty due to the delays....

Full description

Bibliographic Details
Main Authors: Adelia Tisya, Taufik Hendra
Format: Article
Language:English
Published: EDP Sciences 2019-01-01
Series:MATEC Web of Conferences
Online Access:https://www.matec-conferences.org/articles/matecconf/pdf/2019/25/matecconf_icancee2019_02026.pdf
id doaj-724bd9ac9e174f6ea72eebb18418130c
record_format Article
spelling doaj-724bd9ac9e174f6ea72eebb18418130c2021-04-02T12:01:36ZengEDP SciencesMATEC Web of Conferences2261-236X2019-01-012760202610.1051/matecconf/201927602026matecconf_icancee2019_02026Analysis of the acceleration of the time on the project showroom Nissan, office and workshop in Pekanbaru cityAdelia Tisya0Taufik Hendra1Department of Civil Engineering, Universitas RiauDepartment of Civil Engineering, Universitas RiauCompletion time determination in project management is among the first and the most important in the process of planning because it can be the basis for the whole planning. Project completion delay result in the elongation of construction time thus it can inflict a costly penalty due to the delays. Project management so important for implementation a project for avoid problem that can create disadvantages for owner or contractor, one of the problems that commonly occur in a project is a estimated cost and timework isn’t fit with the planning. Project construction Nissan, Office and Workshop at Pekanbaru City were late from contract duration. Work can more fast with 3 ways, alternative overtime work, alternative add more manpower, and alternative shift system. The analysis conducted focuses on unfinished work. Only work with critical path in analysis. Analysis result obtained cost of construction acceleration that caused by overtime alternative is IDR 15,393,542.00 overtime implemented for 4 hours in a day. Workers additional alternative that adjusted by field requirement result is IDR 25,500,000.00 and shift alternative, construction acceleration that caused by shift alternative is IDR 38,940,000.00. In conclusion, the most effective construction acceleration method is overtime alternative, obtained the minimum financial loss and recommended to use for the construction acceleration.https://www.matec-conferences.org/articles/matecconf/pdf/2019/25/matecconf_icancee2019_02026.pdf
collection DOAJ
language English
format Article
sources DOAJ
author Adelia Tisya
Taufik Hendra
spellingShingle Adelia Tisya
Taufik Hendra
Analysis of the acceleration of the time on the project showroom Nissan, office and workshop in Pekanbaru city
MATEC Web of Conferences
author_facet Adelia Tisya
Taufik Hendra
author_sort Adelia Tisya
title Analysis of the acceleration of the time on the project showroom Nissan, office and workshop in Pekanbaru city
title_short Analysis of the acceleration of the time on the project showroom Nissan, office and workshop in Pekanbaru city
title_full Analysis of the acceleration of the time on the project showroom Nissan, office and workshop in Pekanbaru city
title_fullStr Analysis of the acceleration of the time on the project showroom Nissan, office and workshop in Pekanbaru city
title_full_unstemmed Analysis of the acceleration of the time on the project showroom Nissan, office and workshop in Pekanbaru city
title_sort analysis of the acceleration of the time on the project showroom nissan, office and workshop in pekanbaru city
publisher EDP Sciences
series MATEC Web of Conferences
issn 2261-236X
publishDate 2019-01-01
description Completion time determination in project management is among the first and the most important in the process of planning because it can be the basis for the whole planning. Project completion delay result in the elongation of construction time thus it can inflict a costly penalty due to the delays. Project management so important for implementation a project for avoid problem that can create disadvantages for owner or contractor, one of the problems that commonly occur in a project is a estimated cost and timework isn’t fit with the planning. Project construction Nissan, Office and Workshop at Pekanbaru City were late from contract duration. Work can more fast with 3 ways, alternative overtime work, alternative add more manpower, and alternative shift system. The analysis conducted focuses on unfinished work. Only work with critical path in analysis. Analysis result obtained cost of construction acceleration that caused by overtime alternative is IDR 15,393,542.00 overtime implemented for 4 hours in a day. Workers additional alternative that adjusted by field requirement result is IDR 25,500,000.00 and shift alternative, construction acceleration that caused by shift alternative is IDR 38,940,000.00. In conclusion, the most effective construction acceleration method is overtime alternative, obtained the minimum financial loss and recommended to use for the construction acceleration.
url https://www.matec-conferences.org/articles/matecconf/pdf/2019/25/matecconf_icancee2019_02026.pdf
work_keys_str_mv AT adeliatisya analysisoftheaccelerationofthetimeontheprojectshowroomnissanofficeandworkshopinpekanbarucity
AT taufikhendra analysisoftheaccelerationofthetimeontheprojectshowroomnissanofficeandworkshopinpekanbarucity
_version_ 1721570392244486144