Determination of the optimal option for production of the convex cost function

The choice of the optimal option for the production of in the construction of buildings and structures is based on a preliminary generalization and analysis of the most promising options for the implementation of construction and installation from which the most rational optimal in the is selected c...

Full description

Bibliographic Details
Main Authors: Petrosyan Rima, Mailyan Alexander
Format: Article
Language:English
Published: EDP Sciences 2020-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/24/e3sconf_tpacee2020_09039.pdf
Description
Summary:The choice of the optimal option for the production of in the construction of buildings and structures is based on a preliminary generalization and analysis of the most promising options for the implementation of construction and installation from which the most rational optimal in the is selected conditions under consideration. The purpose of the study is to determine the optimal option for production of at the convex cost function. We used the method of the determination of costs on the duration of works, represented by a convex function showing the shorter the duration of the project the more costs are required when it is reduced by the same amount. The key parameters affecting the final result of construction are the duration cost and quality of performed. Consequently, one of the main tasks is to draw up a works schedule with close coordination of the resources necessary for their implementation. To do this we have to solve problems associated with the distribution of limited resources. In this case, the technological interdependence between the works performed, which may be of a different nature, should be taken into account. As the results, new approaches were founded to developing a strategy for the selection of options for construction and installation works in order to ensure contractual deadlines for their implementation and minimize the funds spent on their implementation taking into account the nature of the dependencies between the works performed is an urgent and important problem.
ISSN:2267-1242