Analysis of working behavior of Jinping-I Arch Dam during initial impoundment

To study the stress, deformation, and seepage pressure during the initial impoundment of the Jinping-I Arch Dam, monitoring analysis and numerical calculation were used in a dam behavior analysis that focused on the working behavior of the dam during the late period of the initial impoundment up to...

Full description

Bibliographic Details
Main Authors: Shi-yong Wu, Wei Cao, Jiang Zheng
Format: Article
Language:English
Published: Elsevier 2016-07-01
Series:Water Science and Engineering
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S1674237016300400
id doaj-6df3de3de6444a0caea2d0e41123799a
record_format Article
spelling doaj-6df3de3de6444a0caea2d0e41123799a2020-11-24T20:42:03ZengElsevierWater Science and Engineering1674-23702016-07-019324024810.1016/j.wse.2016.11.001Analysis of working behavior of Jinping-I Arch Dam during initial impoundmentShi-yong WuWei CaoJiang ZhengTo study the stress, deformation, and seepage pressure during the initial impoundment of the Jinping-I Arch Dam, monitoring analysis and numerical calculation were used in a dam behavior analysis that focused on the working behavior of the dam during the late period of the initial impoundment up to the end of November 2014. The numerical calculation was performed based on feedback analysis of the deformation and stress of the arch dam through inversion of the elastic moduli (E) of the dam body and foundation, using a three-dimensional finite element model for the linear elastic material of the arch dam. The main monitoring indices presented insignificant changes in the late period of the initial impoundment, and the results of feedback analysis were consistent with monitoring results. Analysis results also show that the deformations of the dam body and dam foundation were within the design range; the dam stress distributions were normal, with values lower than the design control criteria; and the seepage flows through the dam body and dam foundation were lower than the design drainage capacity of the deep-well pump house, demonstrating that the Jinping-I Arch Dam was in good working condition, and the initial impoundment had been successfully completed. The results of the working behavior analysis of the Jinping-I hydropower project during the initial impoundment can provide references for safe operation of similar projects.http://www.sciencedirect.com/science/article/pii/S1674237016300400Dam safety monitoringWorking behaviorElastic modulusDam impoundmentJinping-I hydropower project
collection DOAJ
language English
format Article
sources DOAJ
author Shi-yong Wu
Wei Cao
Jiang Zheng
spellingShingle Shi-yong Wu
Wei Cao
Jiang Zheng
Analysis of working behavior of Jinping-I Arch Dam during initial impoundment
Water Science and Engineering
Dam safety monitoring
Working behavior
Elastic modulus
Dam impoundment
Jinping-I hydropower project
author_facet Shi-yong Wu
Wei Cao
Jiang Zheng
author_sort Shi-yong Wu
title Analysis of working behavior of Jinping-I Arch Dam during initial impoundment
title_short Analysis of working behavior of Jinping-I Arch Dam during initial impoundment
title_full Analysis of working behavior of Jinping-I Arch Dam during initial impoundment
title_fullStr Analysis of working behavior of Jinping-I Arch Dam during initial impoundment
title_full_unstemmed Analysis of working behavior of Jinping-I Arch Dam during initial impoundment
title_sort analysis of working behavior of jinping-i arch dam during initial impoundment
publisher Elsevier
series Water Science and Engineering
issn 1674-2370
publishDate 2016-07-01
description To study the stress, deformation, and seepage pressure during the initial impoundment of the Jinping-I Arch Dam, monitoring analysis and numerical calculation were used in a dam behavior analysis that focused on the working behavior of the dam during the late period of the initial impoundment up to the end of November 2014. The numerical calculation was performed based on feedback analysis of the deformation and stress of the arch dam through inversion of the elastic moduli (E) of the dam body and foundation, using a three-dimensional finite element model for the linear elastic material of the arch dam. The main monitoring indices presented insignificant changes in the late period of the initial impoundment, and the results of feedback analysis were consistent with monitoring results. Analysis results also show that the deformations of the dam body and dam foundation were within the design range; the dam stress distributions were normal, with values lower than the design control criteria; and the seepage flows through the dam body and dam foundation were lower than the design drainage capacity of the deep-well pump house, demonstrating that the Jinping-I Arch Dam was in good working condition, and the initial impoundment had been successfully completed. The results of the working behavior analysis of the Jinping-I hydropower project during the initial impoundment can provide references for safe operation of similar projects.
topic Dam safety monitoring
Working behavior
Elastic modulus
Dam impoundment
Jinping-I hydropower project
url http://www.sciencedirect.com/science/article/pii/S1674237016300400
work_keys_str_mv AT shiyongwu analysisofworkingbehaviorofjinpingiarchdamduringinitialimpoundment
AT weicao analysisofworkingbehaviorofjinpingiarchdamduringinitialimpoundment
AT jiangzheng analysisofworkingbehaviorofjinpingiarchdamduringinitialimpoundment
_version_ 1716823400000782336