PERENCANAAN KAPASITAS PEMBANGKIT PLTM SUNGAI LOGUNG KARANGTALUN KABUPATEN TEMANGGUNG
<p><em>Central Java Province intends to improve the use of renewable energy (EBT) such as water resources. Logung river at Ngaliyan subdistrict, Temanggung district has potential energy for micro power plan. </em></p> <p><em>The first step to use the water resourc...
Main Author: | Agung Nugroho |
---|---|
Format: | Article |
Language: | English |
Published: |
Diponegoro University
2013-12-01
|
Series: | Teknik |
Subjects: | |
Online Access: | http://ejournal.undip.ac.id/index.php/teknik/article/view/6721 |
Similar Items
-
Kapasitas Daya Pembangkit Listrik Tenaga Mikrohidro di Alue Dua Aceh Utara
by: Asri asri
Published: (2014-10-01) -
Studi Potensi Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) Di Aliran Sungai Desa Kejawar Banyumas
by: Unggah Rizki Harto Jawadz, et al.
Published: (2019-02-01) -
Analisis Desain Sistem Pembangkit Listrik Tenaga Surya Kapasitas 50 WP
by: Anwar Ilmar Ramadhan, et al.
Published: (2016-12-01) -
Flood Inundation Prediction of Logung River due to the Break of Logung Dam
by: Listyo Rini Ekaningtyas
Published: (2017-09-01) -
Integrasi Model Pembangkit Listrik Tenaga Angin Pada Analisis Aliran Daya Sistem Tenaga
by: Rudy Gianto
Published: (2020-12-01)