PERENCANAAN KAPASITAS PEMBANGKIT PLTM SUNGAI LOGUNG KARANGTALUN KABUPATEN TEMANGGUNG

<p><em>Central Java Province intends to improve the use of renewable energy (EBT) such as water resources. Logung river at Ngaliyan subdistrict, Temanggung district has potential energy for micro power plan. </em></p> <p><em>The first step to use the water resourc...

Full description

Bibliographic Details
Main Author: Agung Nugroho
Format: Article
Language:English
Published: Diponegoro University 2013-12-01
Series:Teknik
Subjects:
Online Access:http://ejournal.undip.ac.id/index.php/teknik/article/view/6721
id doaj-6db29ddc3dab40d4b91cba9d62122bec
record_format Article
spelling doaj-6db29ddc3dab40d4b91cba9d62122bec2021-04-02T09:40:49ZengDiponegoro UniversityTeknik0852-16972460-99192013-12-013431701735848PERENCANAAN KAPASITAS PEMBANGKIT PLTM SUNGAI LOGUNG KARANGTALUN KABUPATEN TEMANGGUNGAgung Nugroho0Staf Pengajar Jurusan Teknik Elektro Fakultas Teknik Universitas Diponegoro<p><em>Central Java Province intends to improve the use of renewable energy (EBT) such as water resources. Logung river at Ngaliyan subdistrict, Temanggung district has potential energy for micro power plan. </em></p> <p><em>The first step to use the water resource is determining the capacity of a mini hydro power plan in accordance with the conditions of the river Logung. Based on the the technical study, the elvation height between the prospective weir with potential power house is 110 m and the effetive height at 105 m. Logung maximum river flow is 11.06 </em><em>m3/dt, with average flow is 4,77 m3/dt., The minimum flow is 0,75 m3/dt. This electricity power is 10253.12 KW with maximum flow, it will be produced 4848.44 KW at maximum flow 60 %. The minimum flow can deliver 695,28 KW. The suitable capacity for the generator of micro power plants of Logung is 3220 KVA when it is according to manufacture. </em></p> <p><em>Key words</em><em> : power, flow, power</em></p>http://ejournal.undip.ac.id/index.php/teknik/article/view/6721power, flow, power
collection DOAJ
language English
format Article
sources DOAJ
author Agung Nugroho
spellingShingle Agung Nugroho
PERENCANAAN KAPASITAS PEMBANGKIT PLTM SUNGAI LOGUNG KARANGTALUN KABUPATEN TEMANGGUNG
Teknik
power, flow, power
author_facet Agung Nugroho
author_sort Agung Nugroho
title PERENCANAAN KAPASITAS PEMBANGKIT PLTM SUNGAI LOGUNG KARANGTALUN KABUPATEN TEMANGGUNG
title_short PERENCANAAN KAPASITAS PEMBANGKIT PLTM SUNGAI LOGUNG KARANGTALUN KABUPATEN TEMANGGUNG
title_full PERENCANAAN KAPASITAS PEMBANGKIT PLTM SUNGAI LOGUNG KARANGTALUN KABUPATEN TEMANGGUNG
title_fullStr PERENCANAAN KAPASITAS PEMBANGKIT PLTM SUNGAI LOGUNG KARANGTALUN KABUPATEN TEMANGGUNG
title_full_unstemmed PERENCANAAN KAPASITAS PEMBANGKIT PLTM SUNGAI LOGUNG KARANGTALUN KABUPATEN TEMANGGUNG
title_sort perencanaan kapasitas pembangkit pltm sungai logung karangtalun kabupaten temanggung
publisher Diponegoro University
series Teknik
issn 0852-1697
2460-9919
publishDate 2013-12-01
description <p><em>Central Java Province intends to improve the use of renewable energy (EBT) such as water resources. Logung river at Ngaliyan subdistrict, Temanggung district has potential energy for micro power plan. </em></p> <p><em>The first step to use the water resource is determining the capacity of a mini hydro power plan in accordance with the conditions of the river Logung. Based on the the technical study, the elvation height between the prospective weir with potential power house is 110 m and the effetive height at 105 m. Logung maximum river flow is 11.06 </em><em>m3/dt, with average flow is 4,77 m3/dt., The minimum flow is 0,75 m3/dt. This electricity power is 10253.12 KW with maximum flow, it will be produced 4848.44 KW at maximum flow 60 %. The minimum flow can deliver 695,28 KW. The suitable capacity for the generator of micro power plants of Logung is 3220 KVA when it is according to manufacture. </em></p> <p><em>Key words</em><em> : power, flow, power</em></p>
topic power, flow, power
url http://ejournal.undip.ac.id/index.php/teknik/article/view/6721
work_keys_str_mv AT agungnugroho perencanaankapasitaspembangkitpltmsungailogungkarangtalunkabupatentemanggung
_version_ 1724168893912580096