Estimation of Minimum Principal Stress from an Extended Leak-off Test Onboard the <i>Chikyu</i> Drilling Vessel and Suggestions for Future Test Procedures
No abstract available. <br><br> doi:<a href="http://dx.doi.org/10.2204/iodp.sd.6.06.2008" target="_blank">10.2204/iodp.sd.6.06.2008</a>
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Copernicus Publications
2008-07-01
|
Series: | Scientific Drilling |
Online Access: | http://www.sci-dril.net/6/43/2008/sd-6-43-2008.pdf |
Summary: | No abstract available.
<br><br>
doi:<a href="http://dx.doi.org/10.2204/iodp.sd.6.06.2008" target="_blank">10.2204/iodp.sd.6.06.2008</a> |
---|---|
ISSN: | 1816-8957 1816-3459 |