Estimation of Minimum Principal Stress from an Extended Leak-off Test Onboard the <i>Chikyu</i> Drilling Vessel and Suggestions for Future Test Procedures

No abstract available. <br><br> doi:<a href="http://dx.doi.org/10.2204/iodp.sd.6.06.2008" target="_blank">10.2204/iodp.sd.6.06.2008</a>

Bibliographic Details
Main Authors: W. Lin, K. Yamamoto, H. Ito, H. Masago, Y. Kawamura
Format: Article
Language:English
Published: Copernicus Publications 2008-07-01
Series:Scientific Drilling
Online Access:http://www.sci-dril.net/6/43/2008/sd-6-43-2008.pdf
Description
Summary:No abstract available. <br><br> doi:<a href="http://dx.doi.org/10.2204/iodp.sd.6.06.2008" target="_blank">10.2204/iodp.sd.6.06.2008</a>
ISSN:1816-8957
1816-3459