Improving Tube Design of a Problematic Heat Exchanger for Enhanced Safety at Minimal Costs

As part of a preliminary hazard analysis for a new phenol plant, the results of a hazard and operability study (HAZOP) conducted in the initial stages of the project design were re-evaluated due mechanical failure detected during the test operation. Out of the possible mechanical defects for the cru...

Full description

Bibliographic Details
Main Authors: In-Bok Lee, Seunghee Park
Format: Article
Language:English
Published: MDPI AG 2017-08-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/10/8/1236

Similar Items