Research on Continuous Miner Mining with Backfilling Technology under High Geostress and Complex Conditions
Aiming at the mining seam with large burial depth, strong geostress, large deformation of the roadway, and fast deformation speed, in order to efficiently recover the coal resources at the working face and effectively protect the surface buildings. Based on analyse of the law of the appearance of th...
Main Author: | Tao Du |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2020-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/25/e3sconf_caes2020_03042.pdf |
Similar Items
-
Cemented Backfilling Mining Technology for Gently Inclined Coal Seams Using a Continuous Mining and Continuous Backfilling Method
by: Bin Lu, et al.
Published: (2021-01-01) -
Experimental Research on Coal and Gas Delay Outburst and AE Characteristics under Conditions of Geostress and Gas Pressure Disturbance
by: Geng Jiabo, et al.
Published: (2021-01-01) -
Numerical Simulation on Large Deformation of Weak Rock Mass Tunnel Under High Geostress
by: Zhou Feng, et al.
Published: (2018-01-01) -
Zonal Disintegration Mechanism of Deep Rock Masses under Coupled High Axial Geostress and Blasting Load
by: Pu Yuan, et al.
Published: (2018-01-01) -
A Numerical Study of Underground Cavern Stability by Geostress Characteristics
by: Xiao-Jing Li, et al.
Published: (2016-01-01)