Development and installation of control system for a test rig interconnecting a micro Gas Turbine, a Heat Pump and a PCM Storage system

The need to enhance flexibility on current power plant is linked to the strong penetration of non-dispatchable sources in the current energy network, which causes a dramatic need for ancillary services to sustain the grid operability. A framework including a micro Gas Turbine (mGT), a Heat Pump (HP)...

Full description

Bibliographic Details
Main Authors: Rossi Iacopo, Caillere Romain
Format: Article
Language:English
Published: EDP Sciences 2019-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/39/e3sconf_supehr18_01003.pdf
id doaj-6c3536e9cc424e94acae0fa6716b5348
record_format Article
spelling doaj-6c3536e9cc424e94acae0fa6716b53482021-02-02T07:44:55ZengEDP SciencesE3S Web of Conferences2267-12422019-01-011130100310.1051/e3sconf/201911301003e3sconf_supehr18_01003Development and installation of control system for a test rig interconnecting a micro Gas Turbine, a Heat Pump and a PCM Storage systemRossi Iacopo0Caillere RomainUniversity of GenoaThe need to enhance flexibility on current power plant is linked to the strong penetration of non-dispatchable sources in the current energy network, which causes a dramatic need for ancillary services to sustain the grid operability. A framework including a micro Gas Turbine (mGT), a Heat Pump (HP) and a PCM Storage is considered to enhance plant flexibility while facing grid and price fluctuations during day operations. The system so composed is devoted to electrical energy production only. A proper use of the HP allows, for instance, to heat up the compressor intake temperature whilst the system is operating at minimum load. The system can then produce a lower amount of energy in order to be more competitive in the infra-day energy market. At the same time, the cold storage is charged and the stored energy can be later used to power up the system during the peak hours by cooling the compressor intake. This work presents then the installation of the control system devoted to the management and the control of such complex system. The test-bed is defined to test different operating conditions and to validate the operating framework of the whole compound.https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/39/e3sconf_supehr18_01003.pdf
collection DOAJ
language English
format Article
sources DOAJ
author Rossi Iacopo
Caillere Romain
spellingShingle Rossi Iacopo
Caillere Romain
Development and installation of control system for a test rig interconnecting a micro Gas Turbine, a Heat Pump and a PCM Storage system
E3S Web of Conferences
author_facet Rossi Iacopo
Caillere Romain
author_sort Rossi Iacopo
title Development and installation of control system for a test rig interconnecting a micro Gas Turbine, a Heat Pump and a PCM Storage system
title_short Development and installation of control system for a test rig interconnecting a micro Gas Turbine, a Heat Pump and a PCM Storage system
title_full Development and installation of control system for a test rig interconnecting a micro Gas Turbine, a Heat Pump and a PCM Storage system
title_fullStr Development and installation of control system for a test rig interconnecting a micro Gas Turbine, a Heat Pump and a PCM Storage system
title_full_unstemmed Development and installation of control system for a test rig interconnecting a micro Gas Turbine, a Heat Pump and a PCM Storage system
title_sort development and installation of control system for a test rig interconnecting a micro gas turbine, a heat pump and a pcm storage system
publisher EDP Sciences
series E3S Web of Conferences
issn 2267-1242
publishDate 2019-01-01
description The need to enhance flexibility on current power plant is linked to the strong penetration of non-dispatchable sources in the current energy network, which causes a dramatic need for ancillary services to sustain the grid operability. A framework including a micro Gas Turbine (mGT), a Heat Pump (HP) and a PCM Storage is considered to enhance plant flexibility while facing grid and price fluctuations during day operations. The system so composed is devoted to electrical energy production only. A proper use of the HP allows, for instance, to heat up the compressor intake temperature whilst the system is operating at minimum load. The system can then produce a lower amount of energy in order to be more competitive in the infra-day energy market. At the same time, the cold storage is charged and the stored energy can be later used to power up the system during the peak hours by cooling the compressor intake. This work presents then the installation of the control system devoted to the management and the control of such complex system. The test-bed is defined to test different operating conditions and to validate the operating framework of the whole compound.
url https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/39/e3sconf_supehr18_01003.pdf
work_keys_str_mv AT rossiiacopo developmentandinstallationofcontrolsystemforatestriginterconnectingamicrogasturbineaheatpumpandapcmstoragesystem
AT caillereromain developmentandinstallationofcontrolsystemforatestriginterconnectingamicrogasturbineaheatpumpandapcmstoragesystem
_version_ 1724298872219500544