Operational Impact of RES Penetration on a Remote Diesel-Powered System in West Papua, Indonesia
When a new power source connects to the distribution or transmission grid, an assessment of its impact is necessary. Technical studies must assess the possible effects of a proposed expansion, reinforcement or modification to evaluate the possible incidents that may occur. Typically, the calculation...
Main Authors: | M. L. Tuballa, M. L. S. Abundo |
---|---|
Format: | Article |
Language: | English |
Published: |
D. G. Pylarinos
2018-06-01
|
Series: | Engineering, Technology & Applied Science Research |
Subjects: | |
Online Access: | http://etasr.com/index.php/ETASR/article/view/1984 |
Similar Items
-
Rotor Loading Characteristics of a Full-Scale Tidal Turbine
by: Magnus Harrold, et al.
Published: (2019-03-01) -
Tip-Bed Velocity and Scour Depth of Horizontal-Axis Tidal Turbine with Consideration of Tip Clearance
by: Tianming Zhang, et al.
Published: (2019-06-01) -
Assessment of Dependency of Unsteady Onset Flow and Resultant Tidal Turbine Fatigue Loads on Measurement Position at a Tidal Site
by: Hannah Mullings, et al.
Published: (2021-09-01) -
Study of a Bi-Vertical Axis Turbines Farm Using the Actuator Cylinder Method
by: Laurie Jégo, et al.
Published: (2021-08-01) -
Coupled Fluid-Structure Interaction Modelling of Loads Variation and Fatigue Life of a Full-Scale Tidal Turbine under the Effect of Velocity Profile
by: Mujahid Badshah, et al.
Published: (2019-06-01)