The assessment of priorities in the construction of new high-speed railway lines in Czech Republic by using the stem method
The aim of the paper is to set priority of The Fast Connection sections ("Rychlá spojení" in Czech, abbreviation "RS") building mentioned above by using the STEM method. The method is used to select projects with the maximum benefit if the budget is limited. There has not been se...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
CTU Central Library
2021-07-01
|
Series: | Acta Polytechnica CTU Proceedings |
Subjects: | |
Online Access: | https://ojs.cvut.cz/ojs/index.php/APP/article/view/7424 |
id |
doaj-6b48479cfb4a468290c7f839c5709482 |
---|---|
record_format |
Article |
spelling |
doaj-6b48479cfb4a468290c7f839c57094822021-07-23T07:01:46ZengCTU Central LibraryActa Polytechnica CTU Proceedings2336-53822021-07-0131414410.14311/APP.2021.31.00414664The assessment of priorities in the construction of new high-speed railway lines in Czech Republic by using the stem methodPavel Purkart0Jan Kruntorád1Lukáš Týfa2Czech Technical University in Prague, Faculty of Transportation Sciences, Department of Transportation Systems, Horská 3, 128 03 Prague 2, Czech RepublicCzech Technical University in Prague, Faculty of Transportation Sciences, Department of Transportation Systems, Horská 3, 128 03 Prague 2, Czech RepublicCzech Technical University in Prague, Faculty of Transportation Sciences, Department of Transportation Systems, Horská 3, 128 03 Prague 2, Czech RepublicThe aim of the paper is to set priority of The Fast Connection sections ("Rychlá spojení" in Czech, abbreviation "RS") building mentioned above by using the STEM method. The method is used to select projects with the maximum benefit if the budget is limited. There has not been set a limit for individual RS sections as a limitation of financial costs. The decisive factor is the order in which individual RS sections should be built on the basis of evaluation criteria.https://ojs.cvut.cz/ojs/index.php/APP/article/view/7424high-speed railway lines (hsl)the fast connections (rs)czech republicmathematic modelthe stem methodproject choiceevaluation criteria |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Pavel Purkart Jan Kruntorád Lukáš Týfa |
spellingShingle |
Pavel Purkart Jan Kruntorád Lukáš Týfa The assessment of priorities in the construction of new high-speed railway lines in Czech Republic by using the stem method Acta Polytechnica CTU Proceedings high-speed railway lines (hsl) the fast connections (rs) czech republic mathematic model the stem method project choice evaluation criteria |
author_facet |
Pavel Purkart Jan Kruntorád Lukáš Týfa |
author_sort |
Pavel Purkart |
title |
The assessment of priorities in the construction of new high-speed railway lines in Czech Republic by using the stem method |
title_short |
The assessment of priorities in the construction of new high-speed railway lines in Czech Republic by using the stem method |
title_full |
The assessment of priorities in the construction of new high-speed railway lines in Czech Republic by using the stem method |
title_fullStr |
The assessment of priorities in the construction of new high-speed railway lines in Czech Republic by using the stem method |
title_full_unstemmed |
The assessment of priorities in the construction of new high-speed railway lines in Czech Republic by using the stem method |
title_sort |
assessment of priorities in the construction of new high-speed railway lines in czech republic by using the stem method |
publisher |
CTU Central Library |
series |
Acta Polytechnica CTU Proceedings |
issn |
2336-5382 |
publishDate |
2021-07-01 |
description |
The aim of the paper is to set priority of The Fast Connection sections ("Rychlá spojení" in Czech, abbreviation "RS") building mentioned above by using the STEM method. The method is used to select projects with the maximum benefit if the budget is limited. There has not been set a limit for individual RS sections as a limitation of financial costs. The decisive factor is the order in which individual RS sections should be built on the basis of evaluation criteria. |
topic |
high-speed railway lines (hsl) the fast connections (rs) czech republic mathematic model the stem method project choice evaluation criteria |
url |
https://ojs.cvut.cz/ojs/index.php/APP/article/view/7424 |
work_keys_str_mv |
AT pavelpurkart theassessmentofprioritiesintheconstructionofnewhighspeedrailwaylinesinczechrepublicbyusingthestemmethod AT jankruntorad theassessmentofprioritiesintheconstructionofnewhighspeedrailwaylinesinczechrepublicbyusingthestemmethod AT lukastyfa theassessmentofprioritiesintheconstructionofnewhighspeedrailwaylinesinczechrepublicbyusingthestemmethod AT pavelpurkart assessmentofprioritiesintheconstructionofnewhighspeedrailwaylinesinczechrepublicbyusingthestemmethod AT jankruntorad assessmentofprioritiesintheconstructionofnewhighspeedrailwaylinesinczechrepublicbyusingthestemmethod AT lukastyfa assessmentofprioritiesintheconstructionofnewhighspeedrailwaylinesinczechrepublicbyusingthestemmethod |
_version_ |
1721290383145566208 |