The assessment of priorities in the construction of new high-speed railway lines in Czech Republic by using the stem method

The aim of the paper is to set priority of The Fast Connection sections ("Rychlá spojení" in Czech, abbreviation "RS") building mentioned above by using the STEM method. The method is used to select projects with the maximum benefit if the budget is limited. There has not been se...

Full description

Bibliographic Details
Main Authors: Pavel Purkart, Jan Kruntorád, Lukáš Týfa
Format: Article
Language:English
Published: CTU Central Library 2021-07-01
Series:Acta Polytechnica CTU Proceedings
Subjects:
Online Access:https://ojs.cvut.cz/ojs/index.php/APP/article/view/7424
id doaj-6b48479cfb4a468290c7f839c5709482
record_format Article
spelling doaj-6b48479cfb4a468290c7f839c57094822021-07-23T07:01:46ZengCTU Central LibraryActa Polytechnica CTU Proceedings2336-53822021-07-0131414410.14311/APP.2021.31.00414664The assessment of priorities in the construction of new high-speed railway lines in Czech Republic by using the stem methodPavel Purkart0Jan Kruntorád1Lukáš Týfa2Czech Technical University in Prague, Faculty of Transportation Sciences, Department of Transportation Systems, Horská 3, 128 03 Prague 2, Czech RepublicCzech Technical University in Prague, Faculty of Transportation Sciences, Department of Transportation Systems, Horská 3, 128 03 Prague 2, Czech RepublicCzech Technical University in Prague, Faculty of Transportation Sciences, Department of Transportation Systems, Horská 3, 128 03 Prague 2, Czech RepublicThe aim of the paper is to set priority of The Fast Connection sections ("Rychlá spojení" in Czech, abbreviation "RS") building mentioned above by using the STEM method. The method is used to select projects with the maximum benefit if the budget is limited. There has not been set a limit for individual RS sections as a limitation of financial costs. The decisive factor is the order in which individual RS sections should be built on the basis of evaluation criteria.https://ojs.cvut.cz/ojs/index.php/APP/article/view/7424high-speed railway lines (hsl)the fast connections (rs)czech republicmathematic modelthe stem methodproject choiceevaluation criteria
collection DOAJ
language English
format Article
sources DOAJ
author Pavel Purkart
Jan Kruntorád
Lukáš Týfa
spellingShingle Pavel Purkart
Jan Kruntorád
Lukáš Týfa
The assessment of priorities in the construction of new high-speed railway lines in Czech Republic by using the stem method
Acta Polytechnica CTU Proceedings
high-speed railway lines (hsl)
the fast connections (rs)
czech republic
mathematic model
the stem method
project choice
evaluation criteria
author_facet Pavel Purkart
Jan Kruntorád
Lukáš Týfa
author_sort Pavel Purkart
title The assessment of priorities in the construction of new high-speed railway lines in Czech Republic by using the stem method
title_short The assessment of priorities in the construction of new high-speed railway lines in Czech Republic by using the stem method
title_full The assessment of priorities in the construction of new high-speed railway lines in Czech Republic by using the stem method
title_fullStr The assessment of priorities in the construction of new high-speed railway lines in Czech Republic by using the stem method
title_full_unstemmed The assessment of priorities in the construction of new high-speed railway lines in Czech Republic by using the stem method
title_sort assessment of priorities in the construction of new high-speed railway lines in czech republic by using the stem method
publisher CTU Central Library
series Acta Polytechnica CTU Proceedings
issn 2336-5382
publishDate 2021-07-01
description The aim of the paper is to set priority of The Fast Connection sections ("Rychlá spojení" in Czech, abbreviation "RS") building mentioned above by using the STEM method. The method is used to select projects with the maximum benefit if the budget is limited. There has not been set a limit for individual RS sections as a limitation of financial costs. The decisive factor is the order in which individual RS sections should be built on the basis of evaluation criteria.
topic high-speed railway lines (hsl)
the fast connections (rs)
czech republic
mathematic model
the stem method
project choice
evaluation criteria
url https://ojs.cvut.cz/ojs/index.php/APP/article/view/7424
work_keys_str_mv AT pavelpurkart theassessmentofprioritiesintheconstructionofnewhighspeedrailwaylinesinczechrepublicbyusingthestemmethod
AT jankruntorad theassessmentofprioritiesintheconstructionofnewhighspeedrailwaylinesinczechrepublicbyusingthestemmethod
AT lukastyfa theassessmentofprioritiesintheconstructionofnewhighspeedrailwaylinesinczechrepublicbyusingthestemmethod
AT pavelpurkart assessmentofprioritiesintheconstructionofnewhighspeedrailwaylinesinczechrepublicbyusingthestemmethod
AT jankruntorad assessmentofprioritiesintheconstructionofnewhighspeedrailwaylinesinczechrepublicbyusingthestemmethod
AT lukastyfa assessmentofprioritiesintheconstructionofnewhighspeedrailwaylinesinczechrepublicbyusingthestemmethod
_version_ 1721290383145566208