Overview of hydraulic ash and slag transport in the Power Plantt 'Oslomej': Macedonia
AD ELEM Skopje Subsidiary REK 'Oslomej' s. Oslomej is a part of the energy system with an installed power of 125 MW and the net average annual production of 500 GWh of electricity. The basic fuel is coal with an average of 7600 KJ/kg. Coal from the mine is provided Oslomej - west and old m...
Main Authors: | Cvetanoski Radomir K., Temelkoska Bratica K., Mirčeski Vlatko B. |
---|---|
Format: | Article |
Language: | English |
Published: |
Savez inženjera i tehničara Srbije
2017-01-01
|
Series: | Tehnika |
Subjects: | |
Online Access: | http://scindeks-clanci.ceon.rs/data/pdf/0040-2176/2017/0040-21761704538C.pdf |
Similar Items
-
Technology of application of pipe's arc of the integral pipeline in power plant 'Oslomej'
by: Cvetanoski Radomir, et al.
Published: (2017-01-01) -
Applied methodology for replacement pipe arcs in integral pipelines TE 'Oslomej'
by: Temelkoska Bratica K., et al.
Published: (2016-01-01) -
Ash-slag dumps with annual regulation differentiated flows of ash and slag coal power station
by: E. P. Khagleev
Published: (2018-02-01) -
Properties of non-standard fly ash – slag cements containing calcareous fly ash
by: Katarzyna Synowiec
Published: (2013-09-01) -
Stress distribution in ash and slag mixtures
by: Aleksandr Lunev, et al.
Published: (2019-03-01)