Overview of hydraulic ash and slag transport in the Power Plantt 'Oslomej': Macedonia

AD ELEM Skopje Subsidiary REK 'Oslomej' s. Oslomej is a part of the energy system with an installed power of 125 MW and the net average annual production of 500 GWh of electricity. The basic fuel is coal with an average of 7600 KJ/kg. Coal from the mine is provided Oslomej - west and old m...

Full description

Bibliographic Details
Main Authors: Cvetanoski Radomir K., Temelkoska Bratica K., Mirčeski Vlatko B.
Format: Article
Language:English
Published: Savez inženjera i tehničara Srbije 2017-01-01
Series:Tehnika
Subjects:
ash
Online Access:http://scindeks-clanci.ceon.rs/data/pdf/0040-2176/2017/0040-21761704538C.pdf
id doaj-68cace78e66a44069e67ef2168ab0ccc
record_format Article
spelling doaj-68cace78e66a44069e67ef2168ab0ccc2020-11-25T00:05:40ZengSavez inženjera i tehničara SrbijeTehnika0040-21762560-30862017-01-0172453854410.5937/tehnika1704538C0040-21761704538COverview of hydraulic ash and slag transport in the Power Plantt 'Oslomej': MacedoniaCvetanoski Radomir K.0Temelkoska Bratica K.1Mirčeski Vlatko B.2Univerzitet 'Goce Delčev' Štip, Mašinski fakultet, Vinica, R. MakedonijaUniverzitet 'Goce Delčev' Štip, Mašinski fakultet, Vinica, R. MakedonijaREK 'Oslomej', R. MakedonijaAD ELEM Skopje Subsidiary REK 'Oslomej' s. Oslomej is a part of the energy system with an installed power of 125 MW and the net average annual production of 500 GWh of electricity. The basic fuel is coal with an average of 7600 KJ/kg. Coal from the mine is provided Oslomej - west and old mine (Oslomej-east) wherein 2009. excavated 1.156.709 t. The main aim of the project is solving environmental problems in Power Plant Oslomej and its surrounding area that creates the existing system of transport and disposal of ash and slag (transport of moist ash by conveyor belt at an open landfill), so the main task of this Project is introducing new technologies of transport and disposal of ash and slag in the form of hydro mixtures.http://scindeks-clanci.ceon.rs/data/pdf/0040-2176/2017/0040-21761704538C.pdfhydromixturetransportashslagpump
collection DOAJ
language English
format Article
sources DOAJ
author Cvetanoski Radomir K.
Temelkoska Bratica K.
Mirčeski Vlatko B.
spellingShingle Cvetanoski Radomir K.
Temelkoska Bratica K.
Mirčeski Vlatko B.
Overview of hydraulic ash and slag transport in the Power Plantt 'Oslomej': Macedonia
Tehnika
hydromixture
transport
ash
slag
pump
author_facet Cvetanoski Radomir K.
Temelkoska Bratica K.
Mirčeski Vlatko B.
author_sort Cvetanoski Radomir K.
title Overview of hydraulic ash and slag transport in the Power Plantt 'Oslomej': Macedonia
title_short Overview of hydraulic ash and slag transport in the Power Plantt 'Oslomej': Macedonia
title_full Overview of hydraulic ash and slag transport in the Power Plantt 'Oslomej': Macedonia
title_fullStr Overview of hydraulic ash and slag transport in the Power Plantt 'Oslomej': Macedonia
title_full_unstemmed Overview of hydraulic ash and slag transport in the Power Plantt 'Oslomej': Macedonia
title_sort overview of hydraulic ash and slag transport in the power plantt 'oslomej': macedonia
publisher Savez inženjera i tehničara Srbije
series Tehnika
issn 0040-2176
2560-3086
publishDate 2017-01-01
description AD ELEM Skopje Subsidiary REK 'Oslomej' s. Oslomej is a part of the energy system with an installed power of 125 MW and the net average annual production of 500 GWh of electricity. The basic fuel is coal with an average of 7600 KJ/kg. Coal from the mine is provided Oslomej - west and old mine (Oslomej-east) wherein 2009. excavated 1.156.709 t. The main aim of the project is solving environmental problems in Power Plant Oslomej and its surrounding area that creates the existing system of transport and disposal of ash and slag (transport of moist ash by conveyor belt at an open landfill), so the main task of this Project is introducing new technologies of transport and disposal of ash and slag in the form of hydro mixtures.
topic hydromixture
transport
ash
slag
pump
url http://scindeks-clanci.ceon.rs/data/pdf/0040-2176/2017/0040-21761704538C.pdf
work_keys_str_mv AT cvetanoskiradomirk overviewofhydraulicashandslagtransportinthepowerplanttoslomejmacedonia
AT temelkoskabraticak overviewofhydraulicashandslagtransportinthepowerplanttoslomejmacedonia
AT mirceskivlatkob overviewofhydraulicashandslagtransportinthepowerplanttoslomejmacedonia
_version_ 1725424042518773760