Understanding the need for pre-injection from permeability measurements: What is the connection?
Pre-grouting ahead of tunnels has three main functions: to control water inflow into the tunnel, to limit groundwater drawdown above the tunnel, and to make tunnelling progress more predictable since rock mass quality is effectively improved. It helps to avoid settlement damage caused by consolidati...
Main Authors: | Nick Barton, Eda Quadros |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2019-06-01
|
Series: | Journal of Rock Mechanics and Geotechnical Engineering |
Online Access: | http://www.sciencedirect.com/science/article/pii/S1674775518304219 |
Similar Items
-
Understanding Melanoma: What You Need to Know
by: Martha F. Earl
Published: (2016-09-01) -
Understanding the bladder cancer patients experience: What are the needs?
by: A. Bessa, et al.
Published: (2020-07-01) -
Understanding what needs to be done to improve a school
by: Wilson, G. Stuart
Published: (2003) -
The Pre-Veterinary Experience: What You Need to Know
by: Wetli, Ellen Christine
Published: (2010) -
Understanding adaptation in large populations.
by: Nick Barton
Published: (2010-06-01)