Optimizing High-Speed Railroad Timetable with Passenger and Station Service Demands: A Case Study in the Wuhan-Guangzhou Corridor

This paper aims to optimize high-speed railroad timetables for a corridor. We propose an integer programming model using a time-space network-based approach to consider passenger service demands, train scheduling, and station service demands simultaneously. A modified branch-and-price algorithm is u...

Full description

Bibliographic Details
Main Authors: Jin Wang, Leishan Zhou, Yixiang Yue, Jinjin Tang, Zixi Bai
Format: Article
Language:English
Published: Hindawi-Wiley 2018-01-01
Series:Journal of Advanced Transportation
Online Access:http://dx.doi.org/10.1155/2018/4530787
id doaj-6808d75939b0453497278c5bb9a2861a
record_format Article
spelling doaj-6808d75939b0453497278c5bb9a2861a2020-11-25T01:57:03ZengHindawi-WileyJournal of Advanced Transportation0197-67292042-31952018-01-01201810.1155/2018/45307874530787Optimizing High-Speed Railroad Timetable with Passenger and Station Service Demands: A Case Study in the Wuhan-Guangzhou CorridorJin Wang0Leishan Zhou1Yixiang Yue2Jinjin Tang3Zixi Bai4School of Traffic and Transportation, Beijing Jiaotong University, Beijing 100044, ChinaSchool of Traffic and Transportation, Beijing Jiaotong University, Beijing 100044, ChinaSchool of Traffic and Transportation, Beijing Jiaotong University, Beijing 100044, ChinaSchool of Traffic and Transportation, Beijing Jiaotong University, Beijing 100044, ChinaSchool of Traffic and Transportation, Beijing Jiaotong University, Beijing 100044, ChinaThis paper aims to optimize high-speed railroad timetables for a corridor. We propose an integer programming model using a time-space network-based approach to consider passenger service demands, train scheduling, and station service demands simultaneously. A modified branch-and-price algorithm is used for the computation. This algorithm solves the linear relaxation of all nodes in a branch-and-bound tree using a column generation algorithm to derive a lower-bound value (LB) and derive an upper-bound value (UB) using a rapid branching strategy. The optimal solution is derived by iteratively updating the upper- and lower-bound values. Three acceleration strategies, namely, initial solution iteration, delayed constraints, and column removal, were designed to accelerate the computation. The effectiveness and efficiency of the proposed model and algorithm were tested using Wuhan-Guangzhou high-speed railroad data. The results show that the proposed model and algorithm can quickly reduce the defined cost function by 38.2% and improve the average travel speed by 10.7 km/h, which indicates that our proposed model and algorithm can effectively improve the quality of a constructed train timetable and the travel efficiency for passengers.http://dx.doi.org/10.1155/2018/4530787
collection DOAJ
language English
format Article
sources DOAJ
author Jin Wang
Leishan Zhou
Yixiang Yue
Jinjin Tang
Zixi Bai
spellingShingle Jin Wang
Leishan Zhou
Yixiang Yue
Jinjin Tang
Zixi Bai
Optimizing High-Speed Railroad Timetable with Passenger and Station Service Demands: A Case Study in the Wuhan-Guangzhou Corridor
Journal of Advanced Transportation
author_facet Jin Wang
Leishan Zhou
Yixiang Yue
Jinjin Tang
Zixi Bai
author_sort Jin Wang
title Optimizing High-Speed Railroad Timetable with Passenger and Station Service Demands: A Case Study in the Wuhan-Guangzhou Corridor
title_short Optimizing High-Speed Railroad Timetable with Passenger and Station Service Demands: A Case Study in the Wuhan-Guangzhou Corridor
title_full Optimizing High-Speed Railroad Timetable with Passenger and Station Service Demands: A Case Study in the Wuhan-Guangzhou Corridor
title_fullStr Optimizing High-Speed Railroad Timetable with Passenger and Station Service Demands: A Case Study in the Wuhan-Guangzhou Corridor
title_full_unstemmed Optimizing High-Speed Railroad Timetable with Passenger and Station Service Demands: A Case Study in the Wuhan-Guangzhou Corridor
title_sort optimizing high-speed railroad timetable with passenger and station service demands: a case study in the wuhan-guangzhou corridor
publisher Hindawi-Wiley
series Journal of Advanced Transportation
issn 0197-6729
2042-3195
publishDate 2018-01-01
description This paper aims to optimize high-speed railroad timetables for a corridor. We propose an integer programming model using a time-space network-based approach to consider passenger service demands, train scheduling, and station service demands simultaneously. A modified branch-and-price algorithm is used for the computation. This algorithm solves the linear relaxation of all nodes in a branch-and-bound tree using a column generation algorithm to derive a lower-bound value (LB) and derive an upper-bound value (UB) using a rapid branching strategy. The optimal solution is derived by iteratively updating the upper- and lower-bound values. Three acceleration strategies, namely, initial solution iteration, delayed constraints, and column removal, were designed to accelerate the computation. The effectiveness and efficiency of the proposed model and algorithm were tested using Wuhan-Guangzhou high-speed railroad data. The results show that the proposed model and algorithm can quickly reduce the defined cost function by 38.2% and improve the average travel speed by 10.7 km/h, which indicates that our proposed model and algorithm can effectively improve the quality of a constructed train timetable and the travel efficiency for passengers.
url http://dx.doi.org/10.1155/2018/4530787
work_keys_str_mv AT jinwang optimizinghighspeedrailroadtimetablewithpassengerandstationservicedemandsacasestudyinthewuhanguangzhoucorridor
AT leishanzhou optimizinghighspeedrailroadtimetablewithpassengerandstationservicedemandsacasestudyinthewuhanguangzhoucorridor
AT yixiangyue optimizinghighspeedrailroadtimetablewithpassengerandstationservicedemandsacasestudyinthewuhanguangzhoucorridor
AT jinjintang optimizinghighspeedrailroadtimetablewithpassengerandstationservicedemandsacasestudyinthewuhanguangzhoucorridor
AT zixibai optimizinghighspeedrailroadtimetablewithpassengerandstationservicedemandsacasestudyinthewuhanguangzhoucorridor
_version_ 1724976604166225920