The integrated optimization of robust train timetabling and electric multiple unit circulation and maintenance scheduling problem

Train timetables provide trains’ departure and arrival times at each space node, and electric multiple unit circulation and maintenance schedules assign the tasks of trips and maintenance to electric multiple units. Forming two schedules independently could bring infeasible solutions in both phases...

Full description

Bibliographic Details
Main Authors: Ran Chen, Leishan Zhou, Yixiang Yue, Jinjin Tang, Chao Lu
Format: Article
Language:English
Published: SAGE Publishing 2018-03-01
Series:Advances in Mechanical Engineering
Online Access:https://doi.org/10.1177/1687814018768694
id doaj-67cf0ea4d20c472f94f1a344be70bf8f
record_format Article
spelling doaj-67cf0ea4d20c472f94f1a344be70bf8f2020-11-25T01:27:33ZengSAGE PublishingAdvances in Mechanical Engineering1687-81402018-03-011010.1177/1687814018768694The integrated optimization of robust train timetabling and electric multiple unit circulation and maintenance scheduling problemRan ChenLeishan ZhouYixiang YueJinjin TangChao LuTrain timetables provide trains’ departure and arrival times at each space node, and electric multiple unit circulation and maintenance schedules assign the tasks of trips and maintenance to electric multiple units. Forming two schedules independently could bring infeasible solutions in both phases of forming and practice, so the purpose of this study is to avoid infeasibilities and generate a better integrated solution. To illustrate the two problems in one mathematical model, we introduce a space–time–state framework, which can show not only electric multiple units’ trajectories, but also their accumulative running distance (the core factor in maintenance) as the state dimension simultaneously. Due to the occurrence of the disruptions, delays might be caused in both trains’ traveling and maintenance. Therefore, the buffer time should be inserted into the activities such as running in sections, electric multiple unit circulation and maintenance in order to guarantee robustness. A 0-1 nonlinear integer programming model is built, which integrates the formulations of both robust train timetabling and electric multiple unit circulation and maintenance scheduling problems. It is verified by GAMS solver within small-scale instance. However, due to the large scale of the real-world cases, the GAMS solver cannot deal with that in a receivable computational time. In order to solve this integrated model effectively, we propose an improved ant colony algorithm. This algorithm provides solutions not only as good as GAMS in small-scale cases, but also of high quality in large-scale cases. We obtain the robust train timetables and electric multiple unit assignment and maintenance schedules of Beijing–Shanghai high-speed railway in a relatively short time using the proposed ant colony algorithm.https://doi.org/10.1177/1687814018768694
collection DOAJ
language English
format Article
sources DOAJ
author Ran Chen
Leishan Zhou
Yixiang Yue
Jinjin Tang
Chao Lu
spellingShingle Ran Chen
Leishan Zhou
Yixiang Yue
Jinjin Tang
Chao Lu
The integrated optimization of robust train timetabling and electric multiple unit circulation and maintenance scheduling problem
Advances in Mechanical Engineering
author_facet Ran Chen
Leishan Zhou
Yixiang Yue
Jinjin Tang
Chao Lu
author_sort Ran Chen
title The integrated optimization of robust train timetabling and electric multiple unit circulation and maintenance scheduling problem
title_short The integrated optimization of robust train timetabling and electric multiple unit circulation and maintenance scheduling problem
title_full The integrated optimization of robust train timetabling and electric multiple unit circulation and maintenance scheduling problem
title_fullStr The integrated optimization of robust train timetabling and electric multiple unit circulation and maintenance scheduling problem
title_full_unstemmed The integrated optimization of robust train timetabling and electric multiple unit circulation and maintenance scheduling problem
title_sort integrated optimization of robust train timetabling and electric multiple unit circulation and maintenance scheduling problem
publisher SAGE Publishing
series Advances in Mechanical Engineering
issn 1687-8140
publishDate 2018-03-01
description Train timetables provide trains’ departure and arrival times at each space node, and electric multiple unit circulation and maintenance schedules assign the tasks of trips and maintenance to electric multiple units. Forming two schedules independently could bring infeasible solutions in both phases of forming and practice, so the purpose of this study is to avoid infeasibilities and generate a better integrated solution. To illustrate the two problems in one mathematical model, we introduce a space–time–state framework, which can show not only electric multiple units’ trajectories, but also their accumulative running distance (the core factor in maintenance) as the state dimension simultaneously. Due to the occurrence of the disruptions, delays might be caused in both trains’ traveling and maintenance. Therefore, the buffer time should be inserted into the activities such as running in sections, electric multiple unit circulation and maintenance in order to guarantee robustness. A 0-1 nonlinear integer programming model is built, which integrates the formulations of both robust train timetabling and electric multiple unit circulation and maintenance scheduling problems. It is verified by GAMS solver within small-scale instance. However, due to the large scale of the real-world cases, the GAMS solver cannot deal with that in a receivable computational time. In order to solve this integrated model effectively, we propose an improved ant colony algorithm. This algorithm provides solutions not only as good as GAMS in small-scale cases, but also of high quality in large-scale cases. We obtain the robust train timetables and electric multiple unit assignment and maintenance schedules of Beijing–Shanghai high-speed railway in a relatively short time using the proposed ant colony algorithm.
url https://doi.org/10.1177/1687814018768694
work_keys_str_mv AT ranchen theintegratedoptimizationofrobusttraintimetablingandelectricmultipleunitcirculationandmaintenanceschedulingproblem
AT leishanzhou theintegratedoptimizationofrobusttraintimetablingandelectricmultipleunitcirculationandmaintenanceschedulingproblem
AT yixiangyue theintegratedoptimizationofrobusttraintimetablingandelectricmultipleunitcirculationandmaintenanceschedulingproblem
AT jinjintang theintegratedoptimizationofrobusttraintimetablingandelectricmultipleunitcirculationandmaintenanceschedulingproblem
AT chaolu theintegratedoptimizationofrobusttraintimetablingandelectricmultipleunitcirculationandmaintenanceschedulingproblem
AT ranchen integratedoptimizationofrobusttraintimetablingandelectricmultipleunitcirculationandmaintenanceschedulingproblem
AT leishanzhou integratedoptimizationofrobusttraintimetablingandelectricmultipleunitcirculationandmaintenanceschedulingproblem
AT yixiangyue integratedoptimizationofrobusttraintimetablingandelectricmultipleunitcirculationandmaintenanceschedulingproblem
AT jinjintang integratedoptimizationofrobusttraintimetablingandelectricmultipleunitcirculationandmaintenanceschedulingproblem
AT chaolu integratedoptimizationofrobusttraintimetablingandelectricmultipleunitcirculationandmaintenanceschedulingproblem
_version_ 1725104710905495552