A Cost and Passenger Responsible Optimization Method for the Operation Plan of Additional High-Speed Trains in a Peak Period

In the peak period of a railway system, operators typically add additional trains to provide increased capacity to satisfy the increasing passenger demand. The paper proposes a new optimization framework for designing the operation plan, which includes the number of additional trains, train type, st...

Full description

Bibliographic Details
Main Authors: Yutong Liu, Chengxuan Cao, Ziyan Feng, Yaling Zhou
Format: Article
Language:English
Published: Hindawi-Wiley 2020-01-01
Series:Journal of Advanced Transportation
Online Access:http://dx.doi.org/10.1155/2020/3602727
id doaj-6793421ef9c44364aa9e7ab145026a1d
record_format Article
spelling doaj-6793421ef9c44364aa9e7ab145026a1d2020-11-25T03:32:10ZengHindawi-WileyJournal of Advanced Transportation0197-67292042-31952020-01-01202010.1155/2020/36027273602727A Cost and Passenger Responsible Optimization Method for the Operation Plan of Additional High-Speed Trains in a Peak PeriodYutong Liu0Chengxuan Cao1Ziyan Feng2Yaling Zhou3State Key Laboratory of Rail Traffic Control and Safety, Beijing Jiaotong University, Beijing 100044, ChinaState Key Laboratory of Rail Traffic Control and Safety, Beijing Jiaotong University, Beijing 100044, ChinaState Key Laboratory of Rail Traffic Control and Safety, Beijing Jiaotong University, Beijing 100044, ChinaState Key Laboratory of Rail Traffic Control and Safety, Beijing Jiaotong University, Beijing 100044, ChinaIn the peak period of a railway system, operators typically add additional trains to provide increased capacity to satisfy the increasing passenger demand. The paper proposes a new optimization framework for designing the operation plan, which includes the number of additional trains, train type, stop plan, and timetable, for additional trains in a peak period. A space-time network representation is used to obtain a feasible primary operation plan by finding a set of feasible space-time paths in the space-time network. Considering simultaneously the passenger demand and the trains’ total travel times, we formulate a biobjective integer programming model for generating a cost and passenger responsible primary operation plan. A set of loading capacity constraints are formulated in the model to guarantee a suitable loading capacity for each station’s passenger demand and better service for passengers. The CPLEX solver is used to solve the proposed model and to generate the optimal operation plan. Two sets of numerical experiments are conducted on a small-scale rail corridor and on the Wuhan-Guangzhou rail corridor to evaluate the performance of the proposed method. The results of the experiments show that the primary operation plan can be obtained within an acceptable computation time.http://dx.doi.org/10.1155/2020/3602727
collection DOAJ
language English
format Article
sources DOAJ
author Yutong Liu
Chengxuan Cao
Ziyan Feng
Yaling Zhou
spellingShingle Yutong Liu
Chengxuan Cao
Ziyan Feng
Yaling Zhou
A Cost and Passenger Responsible Optimization Method for the Operation Plan of Additional High-Speed Trains in a Peak Period
Journal of Advanced Transportation
author_facet Yutong Liu
Chengxuan Cao
Ziyan Feng
Yaling Zhou
author_sort Yutong Liu
title A Cost and Passenger Responsible Optimization Method for the Operation Plan of Additional High-Speed Trains in a Peak Period
title_short A Cost and Passenger Responsible Optimization Method for the Operation Plan of Additional High-Speed Trains in a Peak Period
title_full A Cost and Passenger Responsible Optimization Method for the Operation Plan of Additional High-Speed Trains in a Peak Period
title_fullStr A Cost and Passenger Responsible Optimization Method for the Operation Plan of Additional High-Speed Trains in a Peak Period
title_full_unstemmed A Cost and Passenger Responsible Optimization Method for the Operation Plan of Additional High-Speed Trains in a Peak Period
title_sort cost and passenger responsible optimization method for the operation plan of additional high-speed trains in a peak period
publisher Hindawi-Wiley
series Journal of Advanced Transportation
issn 0197-6729
2042-3195
publishDate 2020-01-01
description In the peak period of a railway system, operators typically add additional trains to provide increased capacity to satisfy the increasing passenger demand. The paper proposes a new optimization framework for designing the operation plan, which includes the number of additional trains, train type, stop plan, and timetable, for additional trains in a peak period. A space-time network representation is used to obtain a feasible primary operation plan by finding a set of feasible space-time paths in the space-time network. Considering simultaneously the passenger demand and the trains’ total travel times, we formulate a biobjective integer programming model for generating a cost and passenger responsible primary operation plan. A set of loading capacity constraints are formulated in the model to guarantee a suitable loading capacity for each station’s passenger demand and better service for passengers. The CPLEX solver is used to solve the proposed model and to generate the optimal operation plan. Two sets of numerical experiments are conducted on a small-scale rail corridor and on the Wuhan-Guangzhou rail corridor to evaluate the performance of the proposed method. The results of the experiments show that the primary operation plan can be obtained within an acceptable computation time.
url http://dx.doi.org/10.1155/2020/3602727
work_keys_str_mv AT yutongliu acostandpassengerresponsibleoptimizationmethodfortheoperationplanofadditionalhighspeedtrainsinapeakperiod
AT chengxuancao acostandpassengerresponsibleoptimizationmethodfortheoperationplanofadditionalhighspeedtrainsinapeakperiod
AT ziyanfeng acostandpassengerresponsibleoptimizationmethodfortheoperationplanofadditionalhighspeedtrainsinapeakperiod
AT yalingzhou acostandpassengerresponsibleoptimizationmethodfortheoperationplanofadditionalhighspeedtrainsinapeakperiod
AT yutongliu costandpassengerresponsibleoptimizationmethodfortheoperationplanofadditionalhighspeedtrainsinapeakperiod
AT chengxuancao costandpassengerresponsibleoptimizationmethodfortheoperationplanofadditionalhighspeedtrainsinapeakperiod
AT ziyanfeng costandpassengerresponsibleoptimizationmethodfortheoperationplanofadditionalhighspeedtrainsinapeakperiod
AT yalingzhou costandpassengerresponsibleoptimizationmethodfortheoperationplanofadditionalhighspeedtrainsinapeakperiod
_version_ 1715188617927720960