Solving Single Machine Total Weighted Tardiness Problem with Unequal Release Date Using Neurohybrid Particle Swarm Optimization Approach
A particle swarm optimization algorithm (PSO) has been used to solve the single machine total weighted tardiness problem (SMTWT) with unequal release date. To find the best solutions three different solution approaches have been used. To prepare subhybrid solution system, genetic algorithms (GA) and...
Main Authors: | Tarik Cakar, Rasit Koker |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2015-01-01
|
Series: | Computational Intelligence and Neuroscience |
Online Access: | http://dx.doi.org/10.1155/2015/838925 |
Similar Items
-
Parallel Robot Scheduling to Minimize Mean Tardiness with Unequal Release Date and Precedence Constraints Using a Hybrid Intelligent System
by: Tarık Çakar, et al.
Published: (2012-12-01) -
Minimizing total tardiness on a machine with unequal release dates
by: Chung-Jung Chen, et al.
Published: (2003) -
Heuristics for the single machine weighted quadratic tardiness scheduling problem with unequal release date
by: James Teddy Limousin Sambuchetti
Published: (2019) -
Single Machine Scheduling With Unequal Release Date to Minimize Total Weighted Completion Time
by: Jan-Nen Chen, et al. -
Minimizing Total Weighted Tardiness with Drop Dead Dates in Single Machine Scheduling Problem
by: Mohammad Mahdavi Mazdeh, et al.
Published: (2010-05-01)