An Efficient Optimization Algorithm for Resource-Constrained Steelmaking Scheduling Problems
In this paper, we address the steelmaking scheduling problems with multiple constrained resources. The objective is to minimize the maximum completion time. We consider the continuous casting constraint and resource constraints simultaneously. Based on the artificial bee colony (ABC) algorithm, we p...
Main Authors: | Junqing Li, Peiyong Duan, Hongyan Sang, Song Wang, Zhengmin Liu, Peng Duan |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2018-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/8365773/ |
Similar Items
-
An Improved Migrating Birds Optimization Algorithm for a Hybrid Flow Shop Scheduling within Steel Plants
by: Dayong Han, et al.
Published: (2020-09-01) -
Development of a Steel Plant Rescheduling Algorithm Based on Batch Decisions
by: David García-Menéndez, et al.
Published: (2021-07-01) -
Relevance and Applicability of Multi-objective Resource Constrained Project Scheduling Problem: Review Article
by: V. Oladokun, et al.
Published: (2011-12-01) -
Resource Constrained Project Scheduling with Stochastic Resources
by: Furkan Uysal, et al.
Published: (2018-03-01) -
Integrating Schedule Risk Analysis with Multi-Skilled Resource Scheduling to Improve Resource-Constrained Project Scheduling Problems
by: Muritala Adebayo Isah, et al.
Published: (2021-01-01)