Study of relationship between time overrun and productivity on construction sites

The history of the construction industry worldwide is full of projects that were completed with significant time and cost overruns. In an attempt to reverse this trend, this study aims at establishing the relationship between time overrun and labour productivity on construction sites in Lagos, Niger...

Full description

Bibliographic Details
Main Authors: Ameh, Oko John, Osegbo, Emeka Emmanuel
Format: Article
Language:English
Published: Massey University 2011-12-01
Series:International Journal of Construction Supply Chain Management
Subjects:
Online Access:http://www.ijcscm.com/sites/default/files/issue/nid-6/eronini40_1324337978.pdf
id doaj-65a74394e8804f4da11e534435505eb0
record_format Article
spelling doaj-65a74394e8804f4da11e534435505eb02021-07-02T15:53:48ZengMassey UniversityInternational Journal of Construction Supply Chain Management1179-07762011-12-01115667Study of relationship between time overrun and productivity on construction sitesAmeh, Oko JohnOsegbo, Emeka EmmanuelThe history of the construction industry worldwide is full of projects that were completed with significant time and cost overruns. In an attempt to reverse this trend, this study aims at establishing the relationship between time overrun and labour productivity on construction sites in Lagos, Nigeria. 43 technical and management staff of some medium and large construction firms based in Lagos, Nigeria were sampled and administered a questionnaire survey. The questionnaire contained 18 causes of project time overrun and 14 causes of low labour productivity which had been identified from the literature reviewed. With these a relationship between project time overrun and low labour productivity was established. Both descriptive and inferential statistics were used in analyzing the data. Results indicate that inadequate funds for the project, inadequate planning before project takeoff, inadequate tools and equipment and delay in delivery of material top the list of major causes of time overrun while the use of wrong construction methods, inadequate construction materials and inaccurate drawing/specification are the key factors causing low labour productivity on construction sites. Significant negative relationship was found between time overrun and labour productivity in construction sites in Nigeria. The study concludes by recommending that early appointment of project managers could ensure proper management of both the human and material resources that could guarantee improved productivity and ultimately save projects from time overrun.http://www.ijcscm.com/sites/default/files/issue/nid-6/eronini40_1324337978.pdfConstruction siteLabour productivityTime overrunNigeria.
collection DOAJ
language English
format Article
sources DOAJ
author Ameh, Oko John
Osegbo, Emeka Emmanuel
spellingShingle Ameh, Oko John
Osegbo, Emeka Emmanuel
Study of relationship between time overrun and productivity on construction sites
International Journal of Construction Supply Chain Management
Construction site
Labour productivity
Time overrun
Nigeria.
author_facet Ameh, Oko John
Osegbo, Emeka Emmanuel
author_sort Ameh, Oko John
title Study of relationship between time overrun and productivity on construction sites
title_short Study of relationship between time overrun and productivity on construction sites
title_full Study of relationship between time overrun and productivity on construction sites
title_fullStr Study of relationship between time overrun and productivity on construction sites
title_full_unstemmed Study of relationship between time overrun and productivity on construction sites
title_sort study of relationship between time overrun and productivity on construction sites
publisher Massey University
series International Journal of Construction Supply Chain Management
issn 1179-0776
publishDate 2011-12-01
description The history of the construction industry worldwide is full of projects that were completed with significant time and cost overruns. In an attempt to reverse this trend, this study aims at establishing the relationship between time overrun and labour productivity on construction sites in Lagos, Nigeria. 43 technical and management staff of some medium and large construction firms based in Lagos, Nigeria were sampled and administered a questionnaire survey. The questionnaire contained 18 causes of project time overrun and 14 causes of low labour productivity which had been identified from the literature reviewed. With these a relationship between project time overrun and low labour productivity was established. Both descriptive and inferential statistics were used in analyzing the data. Results indicate that inadequate funds for the project, inadequate planning before project takeoff, inadequate tools and equipment and delay in delivery of material top the list of major causes of time overrun while the use of wrong construction methods, inadequate construction materials and inaccurate drawing/specification are the key factors causing low labour productivity on construction sites. Significant negative relationship was found between time overrun and labour productivity in construction sites in Nigeria. The study concludes by recommending that early appointment of project managers could ensure proper management of both the human and material resources that could guarantee improved productivity and ultimately save projects from time overrun.
topic Construction site
Labour productivity
Time overrun
Nigeria.
url http://www.ijcscm.com/sites/default/files/issue/nid-6/eronini40_1324337978.pdf
work_keys_str_mv AT amehokojohn studyofrelationshipbetweentimeoverrunandproductivityonconstructionsites
AT osegboemekaemmanuel studyofrelationshipbetweentimeoverrunandproductivityonconstructionsites
_version_ 1721327015217332224