Evaluation of energy efficiency measures applied in public buildings (schools & hospitals) in Serbia
The Serbian Energy Efficiency Project 1 (SEEP1 - Design and Supervision Support for Implementation of the Energy Efficiency Improvements in Public Buildings in Serbia), funded by a credit from The World Bank, has involved the energy efficient refurbishment of 28 public buildings in Serbia (...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Institute of Architecture, Urban & Spatial Planning of Serbia
2009-01-01
|
Series: | Spatium |
Subjects: | |
Online Access: | http://www.doiserbia.nb.rs/img/doi/1450-569X/2009/1450-569X0920001S.pdf |
Summary: | The Serbian Energy Efficiency Project 1 (SEEP1 - Design and Supervision
Support for Implementation of the Energy Efficiency Improvements in Public
Buildings in Serbia), funded by a credit from The World Bank, has involved
the energy efficient refurbishment of 28 public buildings in Serbia (12
hospitals and 16 schools). The major goal of the project has been
implementation of the energy efficiency improvements in public buildings in
Serbia and the verification of the energy and cost savings as well as CO2
emission reductions achieved through implementation of the energy efficiency
measures. Significant energy consumption savings have been achieved for all
refurbished buildings with annual savings in the range of 15% to 63% and an
average of 40% over entire project. Associated annual CO2 emission reductions
vary between 15% to 64% with an average of 42%. The average specific space
heating annual energy consumption for the hospitals monitored was ~339 kWh/m2
and has been reduced down to ~205 kWh/m2 after refurbishment. The average
specific space heating annual energy consumption for the schools monitored
was ~243 kWh/m2 and has been reduced down to ~144 kWh/m2 after refurbishment.
The simple payback period (SPP) on investment across all buildings was found
to be about 7.5 years. For hospitals, due to their 24/7 operation, the
average SPP is 5.3 years and for schools is 12.8 years. |
---|---|