Coordination Scheduling of Wind-Hydropower Generation and Profit Allocation Based on Shapley Value Method
The volatility of wind makes the forecasting of wind speed unreliable. The inaccurate forecast in wind speed always leads to generation imbalance and causes Wind Generating Companies’ (WGenCOs) losses in the intrahour market. In contrast to wind power, Hydrogenerating Companies (HGenCOs) can utilize...
Main Authors: | Yi Quan, Min Jiang, Hongjun Sun, Xiaohui Yuan, Li He, Bo Fu |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2020-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/4785183 |
Similar Items
-
Fast Loss Allocation Using Shapley Values and Neural Networks
by: Cheng-Fu Chang, et al.
Published: (2007) -
Associated Consistency and Axiomatizations of Shapley value and Equal Allocation of Nonseparable Costs
by: Yaw-Hwa Hsiao, et al.
Published: (2008) -
Potential Of Shapley Value
by: Yi-Che Yu, et al.
Published: (2005) -
Allocation of costs in projects of multiple uses of water resources: an application of Shapley value
by: Lincoln Sarli Cesar Guedes Lima
Published: (2009) -
The Shapley value for a fair division of group discounts for coordinating cooling loads.
by: Sasan Maleki, et al.
Published: (2020-01-01)