A Fuzzy Linear Programming Model for Improving Productivity of Electrical Energy in Potable Water Supply Facilities (Case study: Sistan Water Supply Project)

One of the most important operational issues in urban drinking water production and distribution systems is to assign a plan for running hours of water supplying electric pumps. The cost of consuming electricity in these pumps allocates most of water and wastewater companies operational costs to its...

Full description

Bibliographic Details
Main Authors: Vahid Baradaran, Abdolvesal Chari
Format: Article
Language:English
Published: Water and Wastewater Consulting Engineers Research Development 2018-03-01
Series:آب و فاضلاب
Subjects:
Online Access:http://www.wwjournal.ir/article_48970_0af2e817674d7dfe63e9466c2791bdb1.pdf
id doaj-60eb040e07654760ad78caf7a67858e9
record_format Article
spelling doaj-60eb040e07654760ad78caf7a67858e92021-03-02T08:16:07ZengWater and Wastewater Consulting Engineers Research Developmentآب و فاضلاب1024-59362383-09052018-03-01291273610.22093/wwj.2017.7157.150448970A Fuzzy Linear Programming Model for Improving Productivity of Electrical Energy in Potable Water Supply Facilities (Case study: Sistan Water Supply Project)Vahid Baradaran0Abdolvesal Chari1Assist. Prof., Dept. of Industrial Engineering, Islamic Azad University, Tehran North Branch, Tehran, IranFormer Graduate Student, Dept. of Industrial Engineering, Islamic Azad University, Zahedan, IranOne of the most important operational issues in urban drinking water production and distribution systems is to assign a plan for running hours of water supplying electric pumps. The cost of consuming electricity in these pumps allocates most of water and wastewater companies operational costs to itself which is dependent to their running hours. In this paper, meanwhile having a field study in Sistan rural water and wastewater company, the constraints for specifying electric pumps operational time in water supplying resources such as restrictions in fulfilling demand, supply potable water with suitable quality and uselessness of electric pumps have been identified. Due to uncertainty and fuzziness of the constraints, a linear programming model with fuzzy restrictions for determining electric pumps running hours per day is submitted with the aim to minimize electricity consumption and cost. After collecting and using required data for model, it proved that using the proposed model could reduce the costs of electrical energy and increase productivity up to 23 percent per month. The proposed mathematical fuzzy programming is able to specify electric pumps scheduling plan for water supply resources with the aim to reduce the costs of consuming energy.http://www.wwjournal.ir/article_48970_0af2e817674d7dfe63e9466c2791bdb1.pdfProductivity of Electrical EnergyElectric Pumps Scheduling PlanPotable WaterFuzzy linear programming
collection DOAJ
language English
format Article
sources DOAJ
author Vahid Baradaran
Abdolvesal Chari
spellingShingle Vahid Baradaran
Abdolvesal Chari
A Fuzzy Linear Programming Model for Improving Productivity of Electrical Energy in Potable Water Supply Facilities (Case study: Sistan Water Supply Project)
آب و فاضلاب
Productivity of Electrical Energy
Electric Pumps Scheduling Plan
Potable Water
Fuzzy linear programming
author_facet Vahid Baradaran
Abdolvesal Chari
author_sort Vahid Baradaran
title A Fuzzy Linear Programming Model for Improving Productivity of Electrical Energy in Potable Water Supply Facilities (Case study: Sistan Water Supply Project)
title_short A Fuzzy Linear Programming Model for Improving Productivity of Electrical Energy in Potable Water Supply Facilities (Case study: Sistan Water Supply Project)
title_full A Fuzzy Linear Programming Model for Improving Productivity of Electrical Energy in Potable Water Supply Facilities (Case study: Sistan Water Supply Project)
title_fullStr A Fuzzy Linear Programming Model for Improving Productivity of Electrical Energy in Potable Water Supply Facilities (Case study: Sistan Water Supply Project)
title_full_unstemmed A Fuzzy Linear Programming Model for Improving Productivity of Electrical Energy in Potable Water Supply Facilities (Case study: Sistan Water Supply Project)
title_sort fuzzy linear programming model for improving productivity of electrical energy in potable water supply facilities (case study: sistan water supply project)
publisher Water and Wastewater Consulting Engineers Research Development
series آب و فاضلاب
issn 1024-5936
2383-0905
publishDate 2018-03-01
description One of the most important operational issues in urban drinking water production and distribution systems is to assign a plan for running hours of water supplying electric pumps. The cost of consuming electricity in these pumps allocates most of water and wastewater companies operational costs to itself which is dependent to their running hours. In this paper, meanwhile having a field study in Sistan rural water and wastewater company, the constraints for specifying electric pumps operational time in water supplying resources such as restrictions in fulfilling demand, supply potable water with suitable quality and uselessness of electric pumps have been identified. Due to uncertainty and fuzziness of the constraints, a linear programming model with fuzzy restrictions for determining electric pumps running hours per day is submitted with the aim to minimize electricity consumption and cost. After collecting and using required data for model, it proved that using the proposed model could reduce the costs of electrical energy and increase productivity up to 23 percent per month. The proposed mathematical fuzzy programming is able to specify electric pumps scheduling plan for water supply resources with the aim to reduce the costs of consuming energy.
topic Productivity of Electrical Energy
Electric Pumps Scheduling Plan
Potable Water
Fuzzy linear programming
url http://www.wwjournal.ir/article_48970_0af2e817674d7dfe63e9466c2791bdb1.pdf
work_keys_str_mv AT vahidbaradaran afuzzylinearprogrammingmodelforimprovingproductivityofelectricalenergyinpotablewatersupplyfacilitiescasestudysistanwatersupplyproject
AT abdolvesalchari afuzzylinearprogrammingmodelforimprovingproductivityofelectricalenergyinpotablewatersupplyfacilitiescasestudysistanwatersupplyproject
AT vahidbaradaran fuzzylinearprogrammingmodelforimprovingproductivityofelectricalenergyinpotablewatersupplyfacilitiescasestudysistanwatersupplyproject
AT abdolvesalchari fuzzylinearprogrammingmodelforimprovingproductivityofelectricalenergyinpotablewatersupplyfacilitiescasestudysistanwatersupplyproject
_version_ 1724240621953089536