Road improvement from flexible pavement to rigid on Munjul - Panimbang Road Banten

Roads are an important element in promoting public welfare. With the approach of regional development, the achievement of balance and equitable regional development. Munjul-Panimbang Road Section, a crossroads of tourist access and liaison between villages and sub-districts, this certainly requires...

Full description

Bibliographic Details
Main Authors: Rosdiyani Telly, Noor Gunawan, Iswan Irja
Format: Article
Language:English
Published: EDP Sciences 2019-01-01
Series:MATEC Web of Conferences
Online Access:https://www.matec-conferences.org/articles/matecconf/pdf/2019/19/matecconf_concern2018_03007.pdf
id doaj-60dba9adc376489aa3cb095ff3e42a0a
record_format Article
spelling doaj-60dba9adc376489aa3cb095ff3e42a0a2021-02-02T05:46:49ZengEDP SciencesMATEC Web of Conferences2261-236X2019-01-012700300710.1051/matecconf/201927003007matecconf_concern2018_03007Road improvement from flexible pavement to rigid on Munjul - Panimbang Road BantenRosdiyani TellyNoor GunawanIswan IrjaRoads are an important element in promoting public welfare. With the approach of regional development, the achievement of balance and equitable regional development. Munjul-Panimbang Road Section, a crossroads of tourist access and liaison between villages and sub-districts, this certainly requires an increase in roads in facilitating transportation mobility. Improving the pavement structure that has been declining is one of the solutions that must be done immediately by replacing the pavement flexure structure into concrete pavement (Rigit Pavement). This project has been completed, thereby analyzing the suitability of the Concrete Pavement Road Pavement Planning. This road improvement uses the Concrete Pavement Concatenated Pavement (BBDT) type, stretching the thickness of concrete plate and the required reinforcement diameter. The research method based on Concrete Pavement Concrete Pavement Planning, Pd T-14 2003. Primary data and secondary data are needed as supporting in research. The result of the analysis shows that concrete pavement planning is 15 cm thick concrete plaster and perforated reinforcement per meter using 5D15 mm - 200 mm, while crosslinks per meter of 2D10 mm - 500 mm can withstand the burden of vehicles traveling on the road with the age of 20 years.https://www.matec-conferences.org/articles/matecconf/pdf/2019/19/matecconf_concern2018_03007.pdf
collection DOAJ
language English
format Article
sources DOAJ
author Rosdiyani Telly
Noor Gunawan
Iswan Irja
spellingShingle Rosdiyani Telly
Noor Gunawan
Iswan Irja
Road improvement from flexible pavement to rigid on Munjul - Panimbang Road Banten
MATEC Web of Conferences
author_facet Rosdiyani Telly
Noor Gunawan
Iswan Irja
author_sort Rosdiyani Telly
title Road improvement from flexible pavement to rigid on Munjul - Panimbang Road Banten
title_short Road improvement from flexible pavement to rigid on Munjul - Panimbang Road Banten
title_full Road improvement from flexible pavement to rigid on Munjul - Panimbang Road Banten
title_fullStr Road improvement from flexible pavement to rigid on Munjul - Panimbang Road Banten
title_full_unstemmed Road improvement from flexible pavement to rigid on Munjul - Panimbang Road Banten
title_sort road improvement from flexible pavement to rigid on munjul - panimbang road banten
publisher EDP Sciences
series MATEC Web of Conferences
issn 2261-236X
publishDate 2019-01-01
description Roads are an important element in promoting public welfare. With the approach of regional development, the achievement of balance and equitable regional development. Munjul-Panimbang Road Section, a crossroads of tourist access and liaison between villages and sub-districts, this certainly requires an increase in roads in facilitating transportation mobility. Improving the pavement structure that has been declining is one of the solutions that must be done immediately by replacing the pavement flexure structure into concrete pavement (Rigit Pavement). This project has been completed, thereby analyzing the suitability of the Concrete Pavement Road Pavement Planning. This road improvement uses the Concrete Pavement Concatenated Pavement (BBDT) type, stretching the thickness of concrete plate and the required reinforcement diameter. The research method based on Concrete Pavement Concrete Pavement Planning, Pd T-14 2003. Primary data and secondary data are needed as supporting in research. The result of the analysis shows that concrete pavement planning is 15 cm thick concrete plaster and perforated reinforcement per meter using 5D15 mm - 200 mm, while crosslinks per meter of 2D10 mm - 500 mm can withstand the burden of vehicles traveling on the road with the age of 20 years.
url https://www.matec-conferences.org/articles/matecconf/pdf/2019/19/matecconf_concern2018_03007.pdf
work_keys_str_mv AT rosdiyanitelly roadimprovementfromflexiblepavementtorigidonmunjulpanimbangroadbanten
AT noorgunawan roadimprovementfromflexiblepavementtorigidonmunjulpanimbangroadbanten
AT iswanirja roadimprovementfromflexiblepavementtorigidonmunjulpanimbangroadbanten
_version_ 1724302821389500416