AHP- fuzzy comprehensive evaluation of the safety risk in power investment project along “the Belt and Road”

Energy is the focal point of “the belt and Road” investment cooperation. Because of the uncertainty factors, the safety risk of investment and construction is high, so the management and control of project is very difficult. Taking the 50M wind farm project in a South Asian country as an example, th...

Full description

Bibliographic Details
Main Authors: Yang Taihua, Li Zhixiang, Qin Jing
Format: Article
Language:English
Published: EDP Sciences 2019-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/44/e3sconf_icaeer18_01039.pdf
Description
Summary:Energy is the focal point of “the belt and Road” investment cooperation. Because of the uncertainty factors, the safety risk of investment and construction is high, so the management and control of project is very difficult. Taking the 50M wind farm project in a South Asian country as an example, this paper constructs a safety risk assessment index system including 14 basic factors through the identification of the safety factors of “the belt and road” power investment project, and analyzes it by using the AHPfuzzy comprehensive evaluation method. The results show that the final safety risk evaluation score of a power investment project in a South Asian country belongs to the “medium risk” range. Geopolitical risk, national sovereignty risk, local legal risk and local natural environment risk are the main indicators, whose risk grade is relatively high. Finally, the paper puts forward the effective risk countermeasures and suggestions.
ISSN:2267-1242