A two-phase solution approach for a manufacturing-distribution problem with rework, outsourcing, and multi-shipment policy
In a recent study, a manufacturing batch-size and end-product shipment problem with outsourcing, multi-shipment, and rework was investigated using mathematical modeling and derivatives in its solution procedure. This study demonstrates that a simplified two-phase algebraic approach can also solve th...
Main Authors: | Peter Chiu Yuan-Shyi, Sung Peng-Cheng, Chiu Victoria |
---|---|
Format: | Article |
Language: | English |
Published: |
Institut za istrazivanja i projektovanja u privredi
2020-01-01
|
Series: | Istrazivanja i projektovanja za privredu |
Subjects: | |
Online Access: | https://scindeks-clanci.ceon.rs/data/pdf/1451-4117/2020/1451-41172004505P.pdf |
Similar Items
-
Determining the optimal cycle length for a multiproduct EMQ problem considering rework and overtime options
by: Yuan-Shyi Peter Chiu, et al.
Published: (2020-05-01) -
A hybrid finite production rate system featuring random breakdown and rework
by: Singa Wang Chiu, et al.
Published: (2020-01-01) -
The Collective Influence of Component Commonality, Adjustable-Rate, Postponement, and Rework on Multi-Item Manufacturing Decision
by: Singa Wang Chiu, et al.
Published: (2020-09-01) -
A Single-Stage Manufacturing Model with Imperfect Items, Inspections, Rework, and Planned Backorders
by: Chang Wook Kang, et al.
Published: (2019-05-01) -
Rework Quantification and Influence of Rework on Duration and Cost of Equipment Development Task
by: Xilin Zhang, et al.
Published: (2018-10-01)