A hybrid multi-objective gray wolf optimization algorithm for a fuzzy blocking flow shop scheduling problem
Blocking flow shop scheduling problems have important applications in manufacturing. Because of the imprecise and vague temporal parameters in real-world production, this article formulates a fuzzy blocking flow shop scheduling problem with fuzzy processing time and fuzzy due date in order to minimi...
Main Authors: | Zhi Yang, Cungen Liu |
---|---|
Format: | Article |
Language: | English |
Published: |
SAGE Publishing
2018-03-01
|
Series: | Advances in Mechanical Engineering |
Online Access: | https://doi.org/10.1177/1687814018765535 |
Similar Items
-
Multi-Objective Genetic Algorithm for Hybrid Flow Shop Scheduling Problem
by: Lai, Jeff, et al.
Published: (2014) -
Robust multi-objective hybrid flow shop scheduling
by: Behnaz Zanjani, et al.
Published: (2021-03-01) -
An Improved Genetic Algorithms for Multi-objective Hybrid Flow-shop Scheduling Problem
by: Zijin Zhao, et al.
Published: (2019-01-01) -
A Fuzzy Multi-Objective Hybrid Genetic Algorithm System Approach for Job Shop Scheduling
by: Yu-Ting Lo, et al.
Published: (1999) -
Multi-Objective Migrating Birds Optimization Algorithm for Stochastic Lot-Streaming Flow Shop Scheduling With Blocking
by: Yuyan Han, et al.
Published: (2019-01-01)