A hybrid multi-objective gray wolf optimization algorithm for a fuzzy blocking flow shop scheduling problem

Blocking flow shop scheduling problems have important applications in manufacturing. Because of the imprecise and vague temporal parameters in real-world production, this article formulates a fuzzy blocking flow shop scheduling problem with fuzzy processing time and fuzzy due date in order to minimi...

Full description

Bibliographic Details
Main Authors: Zhi Yang, Cungen Liu
Format: Article
Language:English
Published: SAGE Publishing 2018-03-01
Series:Advances in Mechanical Engineering
Online Access:https://doi.org/10.1177/1687814018765535