Shortening start-up and an extension of the power unit load range

A power plant with additional water pressure tanks was proposed. The maximum rise in the block electric power resulting from the shut-off of low-pressure regenerative heaters was determined. At that time, the boiler is fed with hot water from water pressure tanks acting as heat accumulators. Accumul...

Full description

Bibliographic Details
Main Authors: Taler Jan, Trojan Marcin, Taler Dawid, Dzierwa Piotr, Kaczmarski Karol
Format: Article
Language:English
Published: EDP Sciences 2017-01-01
Series:E3S Web of Conferences
Online Access:https://doi.org/10.1051/e3sconf/20171401022
id doaj-5cf018ef4e12468786256dd8e5c0a961
record_format Article
spelling doaj-5cf018ef4e12468786256dd8e5c0a9612021-02-02T08:57:01ZengEDP SciencesE3S Web of Conferences2267-12422017-01-01140102210.1051/e3sconf/20171401022e3sconf_ef2017_01022Shortening start-up and an extension of the power unit load rangeTaler Jan0Trojan Marcin1Taler Dawid2Dzierwa Piotr3Kaczmarski Karol4Institute of Thermal Power Engineering, Cracow University of TechnologyInstitute of Thermal Power Engineering, Cracow University of TechnologyInstitute of Thermal Engineering and Air Protection, Faculty of Environmental EngineeringInstitute of Thermal Power Engineering, Cracow University of TechnologyInstitute of Thermal Power Engineering, Cracow University of TechnologyA power plant with additional water pressure tanks was proposed. The maximum rise in the block electric power resulting from the shut-off of low-pressure regenerative heaters was determined. At that time, the boiler is fed with hot water from water pressure tanks acting as heat accumulators. Accumulation of hot water in water tanks is also proposed in the periods of the power unit small load. In order to lower the plant electric power in the off-peak night hours, water heated to the nominal temperature in low-pressure regenerative heaters is directed from the feed water tank to pressure tanks. The water accumulated during the night is used to feed the boiler during the period of peak demand for electricity. Pressure accumulators are proposed to be used for the rapid start-up of the boiler from a cold state. The evaporator of the boiler is filled at the beginning of start-up with hot water from the accumulators. Drops in the power block electric power were determined for different capacities of the tanks and periods when they are charged. The tanks may also be used to ensure a sudden increase in the electric power of the unit that is operating in the automatic system of frequency and power control (in Polish: ARCM).https://doi.org/10.1051/e3sconf/20171401022
collection DOAJ
language English
format Article
sources DOAJ
author Taler Jan
Trojan Marcin
Taler Dawid
Dzierwa Piotr
Kaczmarski Karol
spellingShingle Taler Jan
Trojan Marcin
Taler Dawid
Dzierwa Piotr
Kaczmarski Karol
Shortening start-up and an extension of the power unit load range
E3S Web of Conferences
author_facet Taler Jan
Trojan Marcin
Taler Dawid
Dzierwa Piotr
Kaczmarski Karol
author_sort Taler Jan
title Shortening start-up and an extension of the power unit load range
title_short Shortening start-up and an extension of the power unit load range
title_full Shortening start-up and an extension of the power unit load range
title_fullStr Shortening start-up and an extension of the power unit load range
title_full_unstemmed Shortening start-up and an extension of the power unit load range
title_sort shortening start-up and an extension of the power unit load range
publisher EDP Sciences
series E3S Web of Conferences
issn 2267-1242
publishDate 2017-01-01
description A power plant with additional water pressure tanks was proposed. The maximum rise in the block electric power resulting from the shut-off of low-pressure regenerative heaters was determined. At that time, the boiler is fed with hot water from water pressure tanks acting as heat accumulators. Accumulation of hot water in water tanks is also proposed in the periods of the power unit small load. In order to lower the plant electric power in the off-peak night hours, water heated to the nominal temperature in low-pressure regenerative heaters is directed from the feed water tank to pressure tanks. The water accumulated during the night is used to feed the boiler during the period of peak demand for electricity. Pressure accumulators are proposed to be used for the rapid start-up of the boiler from a cold state. The evaporator of the boiler is filled at the beginning of start-up with hot water from the accumulators. Drops in the power block electric power were determined for different capacities of the tanks and periods when they are charged. The tanks may also be used to ensure a sudden increase in the electric power of the unit that is operating in the automatic system of frequency and power control (in Polish: ARCM).
url https://doi.org/10.1051/e3sconf/20171401022
work_keys_str_mv AT talerjan shorteningstartupandanextensionofthepowerunitloadrange
AT trojanmarcin shorteningstartupandanextensionofthepowerunitloadrange
AT talerdawid shorteningstartupandanextensionofthepowerunitloadrange
AT dzierwapiotr shorteningstartupandanextensionofthepowerunitloadrange
AT kaczmarskikarol shorteningstartupandanextensionofthepowerunitloadrange
_version_ 1724295961465847808