Investigation on the Relationship between Wellhead Injection Pressure and Injection Rate for Practical Injection Control in CO2 Geological Storage Projects

The existing investigations on the maximum allowable wellhead injection pressure have found the upper limit of wellhead injection pressure, which, however, cannot provide a practical operational designing scheme of wellhead injection parameters for CO2 geological storage projects. Therefore, this wo...

Full description

Bibliographic Details
Main Authors: Bing Bai, Haiqing Wu, Xiaochun Li
Format: Article
Language:English
Published: Hindawi-Wiley 2018-01-01
Series:Geofluids
Online Access:http://dx.doi.org/10.1155/2018/4927415
id doaj-5c8e153445c945ca9e07d92ca1b76050
record_format Article
spelling doaj-5c8e153445c945ca9e07d92ca1b760502020-11-25T00:48:41ZengHindawi-WileyGeofluids1468-81151468-81232018-01-01201810.1155/2018/49274154927415Investigation on the Relationship between Wellhead Injection Pressure and Injection Rate for Practical Injection Control in CO2 Geological Storage ProjectsBing Bai0Haiqing Wu1Xiaochun Li2State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, ChinaState Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, ChinaState Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, ChinaThe existing investigations on the maximum allowable wellhead injection pressure have found the upper limit of wellhead injection pressure, which, however, cannot provide a practical operational designing scheme of wellhead injection parameters for CO2 geological storage projects. Therefore, this work firstly proposes the complete constraint conditions of wellbore injection to realize the whole process of forward and inverse calculations of wellbore pressure and then applies it to explore the relationship between wellhead injection pressure and injection rate. The results show that the wellhead injection pressure and the injection rate are a pair of mutually constrained physical quantities. For a certain injection project, the allowable wellhead injection pressure and injection rate separately form a continuous interval. Change of one quantity within its allowable interval will also change the other within its interval, both jointly forming a closed region. Thus, controlling the wellhead injection parameters in this closed region can simultaneously ensure the effectiveness and safety of injection. Subsequently, this work further studies the factors of impacting the relationship between wellhead injection pressure and injection rate and finds that all the temperature of injected fluid, the parameters of saturation, and the characteristic parameters of reservoirs only change their upper and lower limits to some extent but have no essential effects on their relationship. Application of this theory and method in Shenhua CCS demonstration project obtained the relationship diagram of wellhead injection pressure and injection rate, which found that its actual injection parameters just fall into the closed region of the relationship diagram, effectively verifying the reliability of this work.http://dx.doi.org/10.1155/2018/4927415
collection DOAJ
language English
format Article
sources DOAJ
author Bing Bai
Haiqing Wu
Xiaochun Li
spellingShingle Bing Bai
Haiqing Wu
Xiaochun Li
Investigation on the Relationship between Wellhead Injection Pressure and Injection Rate for Practical Injection Control in CO2 Geological Storage Projects
Geofluids
author_facet Bing Bai
Haiqing Wu
Xiaochun Li
author_sort Bing Bai
title Investigation on the Relationship between Wellhead Injection Pressure and Injection Rate for Practical Injection Control in CO2 Geological Storage Projects
title_short Investigation on the Relationship between Wellhead Injection Pressure and Injection Rate for Practical Injection Control in CO2 Geological Storage Projects
title_full Investigation on the Relationship between Wellhead Injection Pressure and Injection Rate for Practical Injection Control in CO2 Geological Storage Projects
title_fullStr Investigation on the Relationship between Wellhead Injection Pressure and Injection Rate for Practical Injection Control in CO2 Geological Storage Projects
title_full_unstemmed Investigation on the Relationship between Wellhead Injection Pressure and Injection Rate for Practical Injection Control in CO2 Geological Storage Projects
title_sort investigation on the relationship between wellhead injection pressure and injection rate for practical injection control in co2 geological storage projects
publisher Hindawi-Wiley
series Geofluids
issn 1468-8115
1468-8123
publishDate 2018-01-01
description The existing investigations on the maximum allowable wellhead injection pressure have found the upper limit of wellhead injection pressure, which, however, cannot provide a practical operational designing scheme of wellhead injection parameters for CO2 geological storage projects. Therefore, this work firstly proposes the complete constraint conditions of wellbore injection to realize the whole process of forward and inverse calculations of wellbore pressure and then applies it to explore the relationship between wellhead injection pressure and injection rate. The results show that the wellhead injection pressure and the injection rate are a pair of mutually constrained physical quantities. For a certain injection project, the allowable wellhead injection pressure and injection rate separately form a continuous interval. Change of one quantity within its allowable interval will also change the other within its interval, both jointly forming a closed region. Thus, controlling the wellhead injection parameters in this closed region can simultaneously ensure the effectiveness and safety of injection. Subsequently, this work further studies the factors of impacting the relationship between wellhead injection pressure and injection rate and finds that all the temperature of injected fluid, the parameters of saturation, and the characteristic parameters of reservoirs only change their upper and lower limits to some extent but have no essential effects on their relationship. Application of this theory and method in Shenhua CCS demonstration project obtained the relationship diagram of wellhead injection pressure and injection rate, which found that its actual injection parameters just fall into the closed region of the relationship diagram, effectively verifying the reliability of this work.
url http://dx.doi.org/10.1155/2018/4927415
work_keys_str_mv AT bingbai investigationontherelationshipbetweenwellheadinjectionpressureandinjectionrateforpracticalinjectioncontrolinco2geologicalstorageprojects
AT haiqingwu investigationontherelationshipbetweenwellheadinjectionpressureandinjectionrateforpracticalinjectioncontrolinco2geologicalstorageprojects
AT xiaochunli investigationontherelationshipbetweenwellheadinjectionpressureandinjectionrateforpracticalinjectioncontrolinco2geologicalstorageprojects
_version_ 1725254996106149888