PEMBUATAN KOMPONEN UNTUK MELAKUKAN MAINTAIN PADA PENJADWALAN PROSES PRODUKSI Studi Kasus: Perusahaan Perakitan Emas

Production planning process often changed in schedule, process, or material quantity. Therefore, Production Planning Control (PPC) needs interactive application to help arrange the production scheduling to manage it easier and see the changed schedule immediately. The material requirement, process a...

Full description

Bibliographic Details
Main Author: Silvia Rostianingsih
Format: Article
Language:English
Published: Petra Christian University 2006-01-01
Series:Jurnal Informatika
Subjects:
Online Access:http://puslit2.petra.ac.id/ejournal/index.php/inf/article/view/16486
id doaj-5bc13f08d9b1445f96c5d0b4826eedfa
record_format Article
spelling doaj-5bc13f08d9b1445f96c5d0b4826eedfa2020-11-25T00:56:39ZengPetra Christian UniversityJurnal Informatika1411-01052006-01-0171pp.5660PEMBUATAN KOMPONEN UNTUK MELAKUKAN MAINTAIN PADA PENJADWALAN PROSES PRODUKSI Studi Kasus: Perusahaan Perakitan EmasSilvia RostianingsihProduction planning process often changed in schedule, process, or material quantity. Therefore, Production Planning Control (PPC) needs interactive application to help arrange the production scheduling to manage it easier and see the changed schedule immediately. The material requirement, process and schedule are calculated from customer's order. After that, the production scheduling is transform into Gantt chart which can manage it interactively. The schedule managing done by doing changing the process sequence, erasing the process, move the process, and break down the process. With this interactive scheduling, PPC can manage the production scheduling as the existing system changing. Abstract in Bahasa Indonesia : Penjadwalan proses produksi sering kali mengalami perubahan baik jadwal, proses, maupun jumlah bahan baku. Oleh karena itu, diperlukan pembuatan aplikasi yang interaktif sehingga bagian Production Planning Control (PPC) dapat mengatur jadwal produksi dengan mudah dan dapat langsung melihat perubahan jadwal yang dilakukan. Pesanan dari pelanggan akan dihitung kebutuhan bahan baku dan ditentukan proses serta penjadwalannya. Kemudian dibuat jadwal produksi dalam bentuk Gantt chart yang dapat diatur secara interaktif. Pengaturan jadwal dapat dilakukan dengan melakukan perubahan terhadap urutan proses, menghapus salah satu proses, menggeser proses, dan memecah proses. Dengan adanya penjadwalan yang interaktif ini, PPC dapat mengubah jadwal produksi sesuai dengan perubahan yang terjadi pada sistem yang sedang berjalan. Kata kunci: interaktif, penjadwalan, proses produksi. http://puslit2.petra.ac.id/ejournal/index.php/inf/article/view/16486interactiveschedulingproduction process.
collection DOAJ
language English
format Article
sources DOAJ
author Silvia Rostianingsih
spellingShingle Silvia Rostianingsih
PEMBUATAN KOMPONEN UNTUK MELAKUKAN MAINTAIN PADA PENJADWALAN PROSES PRODUKSI Studi Kasus: Perusahaan Perakitan Emas
Jurnal Informatika
interactive
scheduling
production process.
author_facet Silvia Rostianingsih
author_sort Silvia Rostianingsih
title PEMBUATAN KOMPONEN UNTUK MELAKUKAN MAINTAIN PADA PENJADWALAN PROSES PRODUKSI Studi Kasus: Perusahaan Perakitan Emas
title_short PEMBUATAN KOMPONEN UNTUK MELAKUKAN MAINTAIN PADA PENJADWALAN PROSES PRODUKSI Studi Kasus: Perusahaan Perakitan Emas
title_full PEMBUATAN KOMPONEN UNTUK MELAKUKAN MAINTAIN PADA PENJADWALAN PROSES PRODUKSI Studi Kasus: Perusahaan Perakitan Emas
title_fullStr PEMBUATAN KOMPONEN UNTUK MELAKUKAN MAINTAIN PADA PENJADWALAN PROSES PRODUKSI Studi Kasus: Perusahaan Perakitan Emas
title_full_unstemmed PEMBUATAN KOMPONEN UNTUK MELAKUKAN MAINTAIN PADA PENJADWALAN PROSES PRODUKSI Studi Kasus: Perusahaan Perakitan Emas
title_sort pembuatan komponen untuk melakukan maintain pada penjadwalan proses produksi studi kasus: perusahaan perakitan emas
publisher Petra Christian University
series Jurnal Informatika
issn 1411-0105
publishDate 2006-01-01
description Production planning process often changed in schedule, process, or material quantity. Therefore, Production Planning Control (PPC) needs interactive application to help arrange the production scheduling to manage it easier and see the changed schedule immediately. The material requirement, process and schedule are calculated from customer's order. After that, the production scheduling is transform into Gantt chart which can manage it interactively. The schedule managing done by doing changing the process sequence, erasing the process, move the process, and break down the process. With this interactive scheduling, PPC can manage the production scheduling as the existing system changing. Abstract in Bahasa Indonesia : Penjadwalan proses produksi sering kali mengalami perubahan baik jadwal, proses, maupun jumlah bahan baku. Oleh karena itu, diperlukan pembuatan aplikasi yang interaktif sehingga bagian Production Planning Control (PPC) dapat mengatur jadwal produksi dengan mudah dan dapat langsung melihat perubahan jadwal yang dilakukan. Pesanan dari pelanggan akan dihitung kebutuhan bahan baku dan ditentukan proses serta penjadwalannya. Kemudian dibuat jadwal produksi dalam bentuk Gantt chart yang dapat diatur secara interaktif. Pengaturan jadwal dapat dilakukan dengan melakukan perubahan terhadap urutan proses, menghapus salah satu proses, menggeser proses, dan memecah proses. Dengan adanya penjadwalan yang interaktif ini, PPC dapat mengubah jadwal produksi sesuai dengan perubahan yang terjadi pada sistem yang sedang berjalan. Kata kunci: interaktif, penjadwalan, proses produksi.
topic interactive
scheduling
production process.
url http://puslit2.petra.ac.id/ejournal/index.php/inf/article/view/16486
work_keys_str_mv AT silviarostianingsih pembuatankomponenuntukmelakukanmaintainpadapenjadwalanprosesproduksistudikasusperusahaanperakitanemas
_version_ 1725226292990705664