Construction claim problems in Malaysia: from the contractors perspective

There is high frequency of disputes arising from construction contract claims. Even with the most expert understanding of construction contract and the most reasonable risk-allocation system, claims will continue to present problems if they are poorly managed in practice. The significantly increasin...

Full description

Bibliographic Details
Main Authors: Nor Azmi Bakhary, Hamimah Adnan, Azmi Ibrahim
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:MATEC Web of Conferences
Online Access:https://www.matec-conferences.org/articles/matecconf/pdf/2018/51/matecconf_iceast2018_02004.pdf
id doaj-5af2c54bbe3145c686204432db23017a
record_format Article
spelling doaj-5af2c54bbe3145c686204432db23017a2021-04-02T12:38:52ZengEDP SciencesMATEC Web of Conferences2261-236X2018-01-011920200410.1051/matecconf/201819202004matecconf_iceast2018_02004Construction claim problems in Malaysia: from the contractors perspectiveNor Azmi Bakhary0Hamimah Adnan1Azmi Ibrahim2Faculty of Civil Engineering, 2 Faculty of Architecture, Planning and Surveying Universiti Teknologi MARAFaculty of Civil Engineering, 2 Faculty of Architecture, Planning and Surveying Universiti Teknologi MARAFaculty of Civil Engineering, 2 Faculty of Architecture, Planning and Surveying Universiti Teknologi MARAThere is high frequency of disputes arising from construction contract claims. Even with the most expert understanding of construction contract and the most reasonable risk-allocation system, claims will continue to present problems if they are poorly managed in practice. The significantly increasing number of construction claims indicates the need for the implementation of an effective construction claim management. This research aimed at surveying the most common problems experienced by Malaysian contractors in construction project. The paper presents the survey results and main findings, which indicate that the lack of site staff awareness to proactively detect claims, inaccessibility or unavailability of relevant documents, and conflicts arising during owner/contractor negotiation are all critical problems associated with the process of claim management. The problems observed from this research could be used to solve or improve the contractors' claim management system.https://www.matec-conferences.org/articles/matecconf/pdf/2018/51/matecconf_iceast2018_02004.pdf
collection DOAJ
language English
format Article
sources DOAJ
author Nor Azmi Bakhary
Hamimah Adnan
Azmi Ibrahim
spellingShingle Nor Azmi Bakhary
Hamimah Adnan
Azmi Ibrahim
Construction claim problems in Malaysia: from the contractors perspective
MATEC Web of Conferences
author_facet Nor Azmi Bakhary
Hamimah Adnan
Azmi Ibrahim
author_sort Nor Azmi Bakhary
title Construction claim problems in Malaysia: from the contractors perspective
title_short Construction claim problems in Malaysia: from the contractors perspective
title_full Construction claim problems in Malaysia: from the contractors perspective
title_fullStr Construction claim problems in Malaysia: from the contractors perspective
title_full_unstemmed Construction claim problems in Malaysia: from the contractors perspective
title_sort construction claim problems in malaysia: from the contractors perspective
publisher EDP Sciences
series MATEC Web of Conferences
issn 2261-236X
publishDate 2018-01-01
description There is high frequency of disputes arising from construction contract claims. Even with the most expert understanding of construction contract and the most reasonable risk-allocation system, claims will continue to present problems if they are poorly managed in practice. The significantly increasing number of construction claims indicates the need for the implementation of an effective construction claim management. This research aimed at surveying the most common problems experienced by Malaysian contractors in construction project. The paper presents the survey results and main findings, which indicate that the lack of site staff awareness to proactively detect claims, inaccessibility or unavailability of relevant documents, and conflicts arising during owner/contractor negotiation are all critical problems associated with the process of claim management. The problems observed from this research could be used to solve or improve the contractors' claim management system.
url https://www.matec-conferences.org/articles/matecconf/pdf/2018/51/matecconf_iceast2018_02004.pdf
work_keys_str_mv AT norazmibakhary constructionclaimproblemsinmalaysiafromthecontractorsperspective
AT hamimahadnan constructionclaimproblemsinmalaysiafromthecontractorsperspective
AT azmiibrahim constructionclaimproblemsinmalaysiafromthecontractorsperspective
_version_ 1721568224812728320