Increasing the horizontal resolution of ensemble forecasts at CMC

Ensemble forecasts are run operationally since February 1998 at the Canadian Meteorological Centre, with outputs up to ten days. The ensemble size was increased from eight to sixteen members in August 1999. The method of producing the perturbed analyses consists of running independent assimilati...

Full description

Bibliographic Details
Main Authors: G. Pellerin, L. Lefaivre, P. Houtekamer, C. Girard
Format: Article
Language:English
Published: Copernicus Publications 2003-01-01
Series:Nonlinear Processes in Geophysics
Online Access:http://www.nonlin-processes-geophys.net/10/463/2003/npg-10-463-2003.pdf