SELECTED ASPECTS OF ETCS-L3 DEPLOYMENT
This paper focuses on selected problem areas in the implementation of ETCS L3, analyz-es their impacts and offers a number of possible solutions as a basis for pilot testing. It compares the suitability of each solution and summarizes their advantages and disadvantages.
Main Author: | Petr Koutecký |
---|---|
Format: | Article |
Language: | English |
Published: |
CTU Central Library
2016-09-01
|
Series: | Acta Polytechnica CTU Proceedings |
Online Access: | https://ojs.cvut.cz/ojs/index.php/APP/article/view/3841 |
Similar Items
-
Wider aspects of deceleration supervision in ERTMS/ETCS
by: Nachtigall Petr, et al.
Published: (2018-01-01) -
The Optimal Deployment of Front-End System in Distance-Based ETC System on Freeway
by: Kuang-Han Cheng, et al.
Published: (2008) -
Selected aspects of proper integration between ERTMS/ETCS on-board and trackside devices.
by: Adamski Dominik, et al.
Published: (2019-01-01) -
Gênio, etc
by: Ricardo Basbaum
Published: (2010-02-01) -
‘Etc. Etc.’: Replicating the ‘Exotic’ Body on the Nineteenth-Century British Stage
by: Tiziana Morosetti
Published: (2017-05-01)