A HEADRACE TUNNEL RECONSTRUCTION IN TURKEY
The operation of a hydro power project in North Turkey started in 2015, included the 12km long headrace tunnel. An 8km long lower tunnel section was excavated by double shield TBM technology with 8.7m ID. Due to problems with the mechanised excavation, a 4km long upper tunnel section was excavated c...
Main Authors: | Matouš Hilar, Martin Srb, Jakub Nosek |
---|---|
Format: | Article |
Language: | English |
Published: |
CTU Central Library
2019-07-01
|
Series: | Acta Polytechnica CTU Proceedings |
Subjects: | |
Online Access: | https://ojs.cvut.cz/ojs/index.php/APP/article/view/5694 |
Similar Items
-
Techno - economic analysis for the construction of the supply tunnel of hpp "Dabar" with the application of TBM technology
by: Mirković Uroš B.
Published: (2019-01-01) -
Steel Fibre Reinforced Concrete for Tunnel Lining – Verification by Extensive Laboratory Testing and Numerical Modelling
by: Jaroslav Beňo, et al.
Published: (2013-01-01) -
3D Modelling of a Tunnel Re-excavation in Soft Ground
by: M. Hilar
Published: (2011-01-01) -
Tunnelling in horizontally laminated ground: The influence of lamination thickness on anisotropic behaviour and practical observations from the Niagara Tunnel Project
by: Perras, Matthew A.
Published: (2009) -
Identification and Assessment of Occupational Risks in Mechanized Excavation of Metro Tunnel using the Failure Mode and Effects Analysis Technique (FMEA)
by: Kamran NAJAFI, et al.
Published: (2017-11-01)