A HEADRACE TUNNEL RECONSTRUCTION IN TURKEY
The operation of a hydro power project in North Turkey started in 2015, included the 12km long headrace tunnel. An 8km long lower tunnel section was excavated by double shield TBM technology with 8.7m ID. Due to problems with the mechanised excavation, a 4km long upper tunnel section was excavated c...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
CTU Central Library
2019-07-01
|
Series: | Acta Polytechnica CTU Proceedings |
Subjects: | |
Online Access: | https://ojs.cvut.cz/ojs/index.php/APP/article/view/5694 |