Methodology for linking business processes undertaken during bridge load testing with the specification of required information according to OpenBIM standards
Correct process modelling is crucial for the implementation of BIM technology. Considering the interest of public procurement, the use of open standards supports the transparency of spending public money on construction projects. The aim of this paper is to model the flow of information at the stage...
Main Authors: | Owerko Tomasz, Owerko Piotr |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://doi.org/10.1051/e3sconf/20184500061 |
Similar Items
-
Implementering av openBIM i kalkulasjonsprosessen
by: Muller, Bjørn Christian
Published: (2012) -
Extending the IFC Standard to Enable Road Operation and Maintenance Management through OpenBIM
by: Sara Ait-Lamallam, et al.
Published: (2021-07-01) -
An openBIM Approach to IoT Integration with Incomplete As-Built Data
by: Nicola Moretti, et al.
Published: (2020-11-01) -
The stochastic finite element method in the assessment of bridge infrastructure objects - review
by: Owerko Piotr
Published: (2018-01-01) -
Development of K-BIM e-Submission prototypical system for the openBIM-based building permit framework
by: Inhan Kim, et al.
Published: (2020-11-01)